Go Back   TalkBass Forums > Bass Guitar Forums > Bass Guitar Forums > Off Topic [BG]
Register Rules/FAQ/CUP Members List Search Today's Posts Mark Forums Read

Off Topic [BG] Non-music-related discussion and chat


Supporting Membership
Thank You

Latest Supporting Member
Donate to Upgrade Today

Reply
 
Thread Tools Search this Thread
  #1  
Old 09-24-2010, 05:21 PM
Registered User
 
Join Date: Sep 2004
Location: UP
Plumbers-point removal

Sign in to disble this ad
Here I am on a bass site asking a plumbing question. Has anyone here removed a well point? Mine is plugging up. It's in my basement. I'm going to try tomorrow and I'll take any advice. I'm planning on using a hi-lift jack and wrap chain around the pipe and bring it up. When I get it high enough, I'll secure the pipe and sawzall a section off then bring more up, etc. I was going to try to make a lift off of the floor joists but there isn't a good section above to lift off of.
  #2  
Old 09-24-2010, 05:43 PM
bassteban's Avatar
that video LIES
 
Join Date: Aug 2004
Location: Northern California
Supporting Member
If there's ANY chance of explosive sewage, please video
__________________
Quote:
Originally Posted by Fat Albert View Post
He who throws mud only loses ground.
  #3  
Old 09-25-2010, 11:25 AM
Bob Lee (QSC)'s Avatar
In case you missed it, I work for QSC Audio!

Applications Engineer, QSC Audio
 
Join Date: Jul 2001
Location: Costa Mesa, Calif.
Send a message via Yahoo to Bob Lee (QSC)
GOLD Supporting Member
I helped my dad do that in our basement back when I was maybe around 10.

IIRC, we used an automotive bottle jack on the horizontal pipe right next to the elbow. The jack had a large notched cradle at the top so the pipe didn't slip off. We lifted it up to the jack's limits, lowered the jack and put blocks underneath, and then jacked it up more. When the pipe got up high enough we removed a vertical section and threaded the elbow onto the end of the next one. The basement floor was cement, so it was a very firm surface to push against.

The point was around 15 feet down, or so. It took several hours to pull up. But there was less friction the further up it went. It seemed alomst immovable at first.

Driving the new point down involved using the jack to push against the joists above.

The high-lift jack and wrap chain sounds like a superior technique.
__________________
-Bob

Applications engineer, QSC Audio
Secretary, Audio Engineering Society

"If it sounds good, it is good."
-Duke Ellington
  #4  
Old 09-26-2010, 08:15 AM
Registered User
 
Join Date: Sep 2004
Location: UP
Bob Lee, do you remember if the bottle jack cradle was a home mader or store bought? The hi-lift was a fail. Between two of us, we couldn't keep the top from tipping forward. I didn't want the bottom to kick out and rip up our legs. I couldn't get straight enough over the pipe. Back to the drawing board. I'm thinking of rigging a com-a-long off the joists and try that way. Set a steel rod across a couple 2x4s then support those with 4x4s.
  #5  
Old 09-27-2010, 10:34 AM
Bob Lee (QSC)'s Avatar
In case you missed it, I work for QSC Audio!

Applications Engineer, QSC Audio
 
Join Date: Jul 2001
Location: Costa Mesa, Calif.
Send a message via Yahoo to Bob Lee (QSC)
GOLD Supporting Member
The cradle on the top of the jack was built-in, and actually similar to what you find on most floor jacks. It was a pretty large, heavy duty jack. This was some 40 years ago, and I don't know where or if you can still find one like that one.

Maybe you might consider using two jacks, one on each side, and attach the chain to a steel bar bridged across the tops. Then either extend them simultaneously or alternating little by little.

If you use a comalong hoist off the joists, I'd suggest that you use at least four or five joists to distribute the load, and if possible brace them against the floor as well with some floor jacks.
__________________
-Bob

Applications engineer, QSC Audio
Secretary, Audio Engineering Society

"If it sounds good, it is good."
-Duke Ellington
  #6  
Old 10-13-2010, 07:49 PM
Registered User
 
Join Date: Sep 2004
Location: UP
Update.

Used the comealong off of the joists supported by 4x4s. Worked very well. Slow at hell at first but as the point came up, it went faster. Took longer to re-rig everything than to pull the 5 feet up everytime. The point was 28' total counting the point (3 ft). Went in good except the last five feet and that was hard to drive in but it went. Need to rebuild the pump and I'm back in business.
Reply


Thread Tools Search this Thread
Search this Thread:

Advanced Search

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

vB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are Off
Pingbacks are Off
Refbacks are Off

Follow TalkBass on Twitter   Visit TalkBass on Facebook  

All times are GMT -6. The time now is 12:22 PM.




Copyright 2011 Talk Music Group Inc. All rights reserved.
Play guitar? Visit our new sister site TalkGuitar.com [beta]
Powered by vBulletin® Version 3.6.12
Copyright ©2000 - 2012, Jelsoft Enterprises Ltd.