1. Welcome to TalkBass 2014! If you're new here, we just went through a major site upgrade. Please post all concerns and bugs to the Forum Usage Issues forum. We will be monitoring that forum. Thank you for all of your feedback.

    The TB Android app is working, you may need to uninstall/reinstall. The iPhone app is now updated and should work after you upgrade. TalkBass is responsive to any screen size, so we recommend using your mobile browser for full functionality.

    Please read the TalkBass 2014 FAQ for lots of great info on the new software.

Where to put these?

Discussion in 'Pickups & Electronics [BG]' started by Electrophonic, Jan 21, 2014.

  1. Electrophonic

    Electrophonic

    Joined:
    Aug 11, 2010
    Likes Received:
    0
    I have just finished the installation of EMG PJHZ passive pickups. But these two pieces are not shown or mentioned in detail in the installation manual.

    So, any hints and tips on how to put these together with the ground wiring correctly?

    Attached Files:

  2. srvlives4evr

    srvlives4evr Supporting Member

    Joined:
    Apr 20, 2010
    Likes Received:
    3
    Those are used to connect your bridge ground to the circuit ground. You need this since the HZ are passive pickups, and since you are using the quick connect system (which emphasizes solderless installation). It has instructions right below where you have pictured, "Attaching the bridge ground wire" (1-single black wire with a connector and a IDC connector). Essentially IIRC, connect that wire to the remaining ground terminal on the volume, the use IDC snap piece to connect that wire to your bridge ground wire.
  3. Electrophonic

    Electrophonic

    Joined:
    Aug 11, 2010
    Likes Received:
    0
    Thanks, that helped! I re-read the manual and was a bit afraid to do it wrong. The connector must be pressed until it snaps and I didn´t want to do it wrong the first time.

Share This Page