Hey All,
My girlfriend and I are buying a house and part of the deal is I get to turn a room of the basement into my music studio. The house has a nice finished attic that she will be using as a get away area. The goal here is to isolate the sound enough to where she will not be able to hear band practice in the attic, which is 2 floors above. Additionally, the neighbors are about 25 feet away and I do not want to disturb them.
The house is made of brick, which should deaden some sound from the outside. It also has steam heat, so there will be no duct work for the sound to travel through.
The basement studio has a working brick fireplace, 2 outside brick walls, and 2 inside drywall walls, one of which has a doorway. The total size of the area is approximately 200 sq ft. The ceiling is already finished. I have attached a picture of the room.
I've read that tearing out the ceiling may be in order at least to see if there is dead space between the dry wall and the floor above.
Where should I start? Are my goals realistic? My budget is $2000 and I will be doing all the work myself.
Thanks.
My girlfriend and I are buying a house and part of the deal is I get to turn a room of the basement into my music studio. The house has a nice finished attic that she will be using as a get away area. The goal here is to isolate the sound enough to where she will not be able to hear band practice in the attic, which is 2 floors above. Additionally, the neighbors are about 25 feet away and I do not want to disturb them.
The house is made of brick, which should deaden some sound from the outside. It also has steam heat, so there will be no duct work for the sound to travel through.
The basement studio has a working brick fireplace, 2 outside brick walls, and 2 inside drywall walls, one of which has a doorway. The total size of the area is approximately 200 sq ft. The ceiling is already finished. I have attached a picture of the room.
I've read that tearing out the ceiling may be in order at least to see if there is dead space between the dry wall and the floor above.
Where should I start? Are my goals realistic? My budget is $2000 and I will be doing all the work myself.
Thanks.
