I am actually about 3/4 finished with a B3 mod setup right now. This one has Tap, Rhythm, Patch Down, and Patch Up. The inside wiring and jack mounting is done and now I have to drill and label the half-tube so that I can put the new footswitches in. I'll get to that tomorrow.