Next is all of the stuff I described a couple posts back. After that it’s HVAC, final electrical (contractor), HVAC seal test and refrigerant vacuum (contractor), door staining, flooring, door install (contractor), base trim, door casing, switch plate covers, dance party.What’s next, the flooring?
EDIT: ...and then an isolation test using my drum kit as a noise generator

