28FF4EC6-573B-4D3A-B68C-CEA6C6DC3325.jpeg
May the force be with you!:D

From a Trace Elliot group on Facebook...
 
My week is basically shot, but I've got a four day weekend coming up so I should conceivably be able to finish the trim by Labor Day.

The bad air quality is starting to subside. The air outside in Seattle is still such that if you're outside for 8 hours it's the equivalent of smoking 3.3 cigarettes. That's way down from the 9 it was at points last week and the week before. I've also got the required torque wrenches from my buddy, so as long as the AQI continues to improve I'll be good to go on HVAC soon. I'm planning on doing it the 8th and 9th of September before I leave for a vacation on the 10th. If I can get everything hooked up mechanically and the building sealed back up I'll be happy. Electrical and final mechanical will have to wait for contractors. Baffle boxes for the HRV are still a possibility, but they won't happen until after everything is operational and the interior is finished. I don't want to build them if they're not needed for adequate isolation. If the HRV proves to be a weak link in the isolation perimeter I'll build them after the fact.
 
The door arrived this morning. Crate was in pristine condition. The driver was kind enough to help me load in this massive hulk of a door. My wife was kind enough to give the driver a generous tip. I was dumb enough to run out the door in flip-flops while attempting to maneuver a 330 lbs, slippery plastic wrapped door slab. I still have all my toes, but it certainly wasn’t my wisest move.

View attachment 3127167

View attachment 3127168

View attachment 3127169

View attachment 3127170

View attachment 3127163

View attachment 3127165

View attachment 3127164

View attachment 3127166


Look like fun....I just retired from the commercial door business. Unpacked many doors like that!
 
Does the laminate flooring require any underlayment for air flow, moisture seal, or any other reason?
It doesn’t technically require it, but it’s advised. I’ll be installing 7mm floor muffler. It’s a well regarded product that adds some cushioning “softness” to the feel of hard flooring on a solid (ie no crawlspace or basement) foundation. It also provides all the needed moisture barrier, although my construction methods already keep it out.

Is an acoustic foam pad under the flooring required to provide additional isolation?
Underlayment only provides isolation from flanking paths and footfalls if there’s an occupied space below the floor (ie one floor above another). Since mine is atop a steel floor joist foundation filled with Roxul, several feet of compacted crushed rock and then earth it won’t provide any additional isolation.
 
First of the four vault trim sections is done. You can see on the left side (northwest corner of the structure) where the truss web wasn’t perfectly planar with the rest of the structure. I realized it while building the middle leaf of the ceiling. I realized it again while I was hanging drywall ledgers. I realized it yet again when placing hat channel. I realized it a fourth time when I was building the inner leaf. Each time it got less out of plane, and I was hoping by the time I got here it would be close enough to be invisible. No such luck. A little foam backer rod and a generous application of caulk will make it invisible to everyone but me once it’s all said and done. Good enough to call it a victory as far as I’m concerned :p

EA857221-C944-4CC7-B137-AB3CBCCDADC8.jpeg
 
  • Like
Reactions: Joshua
Good thing I bought that spare board. As soon as I got back from Home Depot I promptly made the 17D miter cut for the wall, and then a 17D miter cut for the vault. The vault’s miter cut should be 13.5D. :banghead:

Oh well. Had a spare. Vestibule is done. With that all of the ceiling trim is installed. After the PL Premium adhesive sets I’ll use a nail set to drive the heads of the nails below the surface of the trim boards, backfill the holes with bondo, and then touch them up with a Q-tip and some white semi-gloss. After that it’s backer rod, caulk and any other white touch-up areas to wrap up this task.

61131FA4-4636-4092-9EC1-B4F93948EF41.jpeg