TalkBass has been independent since 1998. Add your voice.
Create a free account to reply to discussions, view embedded media, and browse with fewer display ads.
Join free Log in
Want zero display ads or expanded classifieds tools? Compare plans.
Nooooo!Today's frustration: The eave venting was constructed such that it is literally impossible to meet the Seattle Building Code for insulation in the attic space.. Tomorrow I'm going to call the building department in Seattle and see what can be done. If I'm screwed and can't meet the permitting requirements I'll be calling my building guy and chewing him out thoroughly. Stay tuned for an update from an insanely frustrated studio builder (aka yours truly).
Vacuum insulated panels? I've never heard of such a product.
Hope that you breeze through when the time comes. Make it look nice, offer him some refreshments to set the tone.
Talk about being made to jump through hoops!.....Best of luck man....Hope that your inspector is a human being rather than a JobsworthNearly done with the ceiling insulation. All I have left are the four bays on the ends that are smaller and require that the walls be insulated prior to installation.
I was planning on getting started on the walls today while I figured out my next steps for the ceiling (see a few posts back). I grabbed a bag of R-21 and noticed that one of the bags was wider than the others. Out of everything I grabbed, one bag was the 24" on-center variety as opposed to the 16" on-center that I need for my walls. Stepping back for a moment I remembered that my trusses are 24" on-center and that the R-21 is only 5.5" thick. Code requires R-38 to within 12" of the eave, which is impossible due to the thickness of the insulation. I opted to cut the 24" on-center R-21 down to 24" lengths and begin filling in the bottom of the ceiling. This won't technically meet code, but since code is unachievable with these particular trusses I decided to move forward like this and explain it to the inspector later.
Better to beg forgiveness than ask permission huh?
View attachment 930245
You can see the division of the two types of insulation and the baffle over the eave vent remaining clear to within 12" for proper ventilation.
View attachment 930246
Tomorrow I'll start on the walls. Hopefully by the end of the weekend I'll be fully insulated and will be able to put in the call for inspection.
Ha ha....I used to live in Wandsworth (England)Jobsworth, haha. Fitting since my last name is Wadsworth!