Double AND some I'm guessing....haha yeah i'm wondering how much this would all cost if you just went straight contractor start to finish. double?
Same for wine cellars.This is normal for studio building, or at least so the pros tell me.
Contractor would get it done in half the time for double the money, if not more. They also wouldn't get the isolation right because they've never done that kind of work.
Ah man, don't tell me that. I want one and have a spot for it....Same for wine cellars.
The design changes I mentioned earlier have created a lot of additional work for me.
Today after our friends who were staying with us for the weekend left my wife and I did some gardening. After that, being admittedly a little burned out, I got to work insulating. I got a bunch more of it done, but decided that before I continued the right thing to do was tear down the loft framing. Getting the loft joists out took about five minutes and was no big deal. The joist hangers on the other hand were an abomination of the highest order! Evidently they're meant to be installed with relative ease, but they do not want to be removed AT ALL. I spent 15-minutes figuring out a way to remove them. I got one out, and removed the top nails from a second and basically hit a wall. It's a ridiculous amount of work to remove one of them, and there are 22 of them installed minus the one that I removed today. I gave up for the night, but over the course of the coming week I'll be working to get them removed. It won't be easy, but the end result will be a better product.
Remove the hangers, build the partition wall all the way to the trusses rather than in a loft configuration, finish the insulation, get the permitting wrapped up, and then it's on to the SMS walls. Moving at the speed of a glacier, but at least it's still moving forward.
ExactlyThey're designed to fight shear forces and engineered to be tough.
The low setting allows it to run as quietly as possible. Even then you have to buy rather high end equipment to get low db or sonnes numbers. For instance, the mini split I have spec'd out will run as low as 19db on its lowest setting! The only contractor cost is for final vaccuum testing, purging and charging of the mini split system and I added some contingency to that as well. I could get the HVAC cost down to under $2,000 if I really wanted but then the system wouldn't be quiet enough for studio work. I'd then be in a situation of turning everything off when it was time to record. That works for a quick take, but an all day session in a room sealed up as air tight as possible simply doesn't work. Try drumming for eight hours while the room fills up with CO2![]()
What do you mean by "loft joists"? Are you talking about the truss bottom chords? Modifying preengineered trusses is not a good idea and would be grounds for rejection by the city inspector. Removing bottom chords would cause your walls to spread out over time.The design changes I mentioned earlier have created a lot of additional work for me.
Today after our friends who were staying with us for the weekend left my wife and I did some gardening. After that, being admittedly a little burned out, I got to work insulating. I got a bunch more of it done, but decided that before I continued the right thing to do was tear down the loft framing. Getting the loft joists out took about five minutes and was no big deal. The joist hangers on the other hand were an abomination of the highest order! Evidently they're meant to be installed with relative ease, but they do not want to be removed AT ALL. I spent 15-minutes figuring out a way to remove them. I got one out, and removed the top nails from a second and basically hit a wall. It's a ridiculous amount of work to remove one of them, and there are 22 of them installed minus the one that I removed today. I gave up for the night, but over the course of the coming week I'll be working to get them removed. It won't be easy, but the end result will be a better product.
Remove the hangers, build the partition wall all the way to the trusses rather than in a loft configuration, finish the insulation, get the permitting wrapped up, and then it's on to the SMS walls. Moving at the speed of a glacier, but at least it's still moving forward.
What do you mean by "loft joists"? Are you talking about the truss bottom chords? Modifying preengineered trusses is not a good idea and would be grounds for rejection by the city inspector. Removing bottom chords would cause your walls to spread out over time.
Cutting corners on ANY part of this has never been part of the equation.From recording in a lot of smaller studios I can't emphasize this enough; if running out of cash, still prioritize the ventilation! You may have the best mic pres money can buy, but you will get lousy performances without fresh air in the room.
Joists that support the floor of the loft and the ceiling of the vestibule underneath the loft.What do you mean by "loft joists"?
No. Additionally, there is no chord on the building trusses. They're scissor trusses. Read back a dozen or so pages in this thread and you'll see plenty of pictures.Are you talking about the truss bottom chords?
Modifying the trusses was never part of my plan. I'm an engineer. I have more sense than that.Modifying preengineered trusses is not a good idea and would be grounds for rejection by the city inspector. Removing bottom chords would cause your walls to spread out over time.
Exactly rightSilky's original design involved a loft space over the entry vestibule, which would function as a large bass trap. He's changed his mind and is extending the front wall up to the ceiling, but first has to remove the framing that he already built for that loft space. I'm pretty sure he's not touching any of the pre-engineered structure.
It all makes sense now: no one other than an engineer would have the patience to navigate the permitting process with how convoluted it has become.Modifying the trusses was never part of my plan. I'm an engineer. I have more sense than that.
Too true. This permitting process has been, as far as I can tell, above and beyond in terms of pain-in-the-butt'ness.It all makes sense now: no one other than an engineer would have the patience to navigate the permitting process with how convoluted it has become.
I work primarily in environmental and general civil fields. You?Engineering is my occupation as well.
Definitely not touching the trusses short of stapling the flange of the insulation batts to them. I didn't realize the bottom portion of a scissor truss was still called a chord.I thought you might have been describing removing the bottom chords (it is still called a bottom chord in a scissor truss) so I thought I should check before you potentially ended up with a collapsed building.
I'm a structural engineer and bridges are my main field of expertise.Too true. This permitting process has been, as far as I can tell, above and beyond in terms of pain-in-the-butt'ness.
I work primarily in environmental and general civil fields. You?
Definitely not touching the trusses short of stapling the flange of the insulation batts to them. I didn't realize the bottom portion of a scissor truss was still called a chord.
Top and bottom members are called "chords". Members connecting them are "webs".all engineered truss members are called chords
That's odd. Seems like some common terms would help alleviate confusion. Or perhaps the idea is "we'll just call all the parts one thing and then say to not mess with that one thing."all engineered truss members are called chords
I started out down a path towards structural before realizing I didn't have an aptitude for it. Beyond the basics I get completely out of my depth. Most of my work these days is in environmental restoration (as well as conservation and mitigation), stormwater management, floodplain development regulations, etc. Lots of eco-friendly greenie stuff.I'm a structural engineer and bridges are my main field of expertise.
Top and bottom members are called "chords". Members connecting them are "webs".
That's odd. Seems like some common terms would help alleviate confusion. Or perhaps the idea is "we'll just call all the parts one thing and then say to not mess with that one thing."
I started out down a path towards structural before realizing I didn't have an aptitude for it. Beyond the basics I get completely out of my depth. Most of my work these days is in environmental restoration (as well as conservation and mitigation), stormwater management, floodplain development regulations, etc. Lots of eco-friendly greenie stuff.