I have a 7 member band (3 guitars, keys, drums, bass, and percussion) and a large PA system (monitors for everyone, 4 powere amps, 32 channel board, processors, EV mains and 2 - 2x18 subs and all the cabling you need). It takes us about 2 hours to setup and get thru a soundcheck for a show - everything goes to the board (we have a soundman). The last show was outdoors for about 1000 people). I hear a lot of people complain about setup time. Some claim it should not take longer than 30 minutes to set up. How long does it take your band to setup when you take a full PA for a large crowd (assuming that you bring the PA)?
For the record, we did a small show last weekend where a PA was supplied, and it took us about 45 minutes (including load in) to setup.