All done!
View attachment 3209449
Here it is from the vestibule side.
View attachment 3209446
Here are two of the door seals.
View attachment 3209447
Here’s a visual representation of the door swings conflict. It’s honestly not THAT bad, but still a little disappointing given my intention of building the space that I wanted to my specifications. Oh well. You live and you learn.
View attachment 3209448
Even without the lever installed (ie there’s a gaping hole in the door currently), the room gets mega quiet when the door is pulled shut. My wife visibly jumped when I shut the door because the room feels noticeably more intimate when the ambient sound level takes an appreciable nose dive.
Tasks remaining:
- HVAC contractor on Monday will wrap up the mini split.
- Install electrical outlet air seals and covers.
- Install door lever.
- Install base trim.
- Install door casing.
- Touch-up wall paint.
- Nail set, bondo, caulk and touch-up paint all the trim.
That’s it for major construction prior to moving my gear in. I may still build a baffle box for the HRV, but that can be done after moving gear in. I also need to bring in shelving and a cabinet for the vestibule, as well as hang all of the treatments, but those are super minor tasks. The real challenge will be resisting the urge to move stuff in before the acoustic treatments arrive.