• TalkBass has been independent since 1998. Add your voice.
    Create a free account to reply to discussions, view embedded media, and browse with fewer display ads.
    Join freeLog in
    Want zero display ads or expanded classifieds tools? Compare plans.

My New Studio Build (perhaps overly detailed)

The city is now telling me that they want another $192 for geotechnical review. The date of the charge is after they'd issued me an ECA exemption. I'm running off to a meeting (stupid day job), but will be calling and seeing what they're thinking as soon as I'm done. I'm not in the habit of throwing away $192 just because someone tells me to. Stay tuned!
 
Building inspector sent me over to a different department. The number he gave me was to some guy's cell phone. He had me email in all of the details and said that he would research what was happening when he got to the office. Hopefully this gets resolved today. I'm in no rush, but I REALLY REALLY REALLY want to be out from under the umbrella of the city after all the hardships they created for me early in this process.
 
  • Like
Reactions: Fat Freddy
Building inspector sent me over to a different department. The number he gave me was to some guy's cell phone. He had me email in all of the details and said that he would research what was happening when he got to the office. Hopefully this gets resolved today. I'm in no rush, but I REALLY REALLY REALLY want to be out from under the umbrella of the city after all the hardships they created for me early in this process.
Hang in there man....hang in there....:)
 
Hang in there man....hang in there....:)
I'm hangin'. In fact I'm still hanging from earlier when I messaged the guy. Hopefully he gets back to me quickly. I know I said previously that I'm in no rush as I won't be able to do anything on this until the weekend of the 25th, but the appeal of being done with the city is far too great to have me sitting idly by. It's like they're dangling a carrot in front of my nose to keep me running towards the finish line :p
 
  • Like
Reactions: Fat Freddy
Apparently they only sell red tape out west.
It definitely feels that way within the city limits. I know of at least one person out in unincorporated King County that built an entire house without pulling a single permit. This was with contractors doing the work who knew to pull permits, but didn't bother. It's an interesting duality. Oh well. At least I'm nearing the end of it. Still no return email from the guy at the city. If I don't hear back from him this morning I'll send him a friendly reminder. As the days go on my reminders will likely get progressively less friendly.
 
  • Like
Reactions: peterpalmieri
Well that went differently than I had expected. For once the city gave me an explanation, complete with reports and detailed information, that made sense. Unfortunately it showed how a clerk in their office had made a mistake reporting on my project and the amount due was left unpaid. They screwed up, but they admitted it, showed me the documentation, and ultimately I just paid the bill which I should have and would have paid in the first place. I'm now $190 lighter, but we're still moving forward.
 
Well that went differently than I had expected. For once the city gave me an explanation, complete with reports and detailed information, that made sense. Unfortunately it showed how a clerk in their office had made a mistake reporting on my project and the amount due was left unpaid. They screwed up, but they admitted it, showed me the documentation, and ultimately I just paid the bill which I should have and would have paid in the first place. I'm now $190 lighter, but we're still moving forward.
Well that's, hopefully, the last bureaucratic hurdle that you'll have to jump.....Onwards and upwards! :)
 
Still waiting on the final site inspection.

In the meantime I aligned and glued down all of the cap blocks, as well as backfilling the area between the substructure and the caps with a type of round rock called Mexican Pebbles.

image.jpeg
image.jpeg
 
Did adjusting the caps on the eastern wall work?
Good memory!

Yeah it worked well enough. My biggest complaint about these caps is that there isn't a corner specific unit, so the very ends along the northern wall look unfinished. I spent a long time trying to align everything through the "field" of the caps (very craggy, bumpy, uneven by design), and the smooth end of the corners. Once I gave up on that and only focused on the field I was able to mostly remove the appearance of the bulge in the wall alignment. It looks much better now.
 
  • Like
Reactions: beans-on-toast