What... A... Day... Whew... Exhausted... drool <- That's me deliriously drooling.
I'm very excited to post a real day of studio work again. I had some insulation posts several weeks ago, but the ball feels like it's really starting to roll again, so you'll have to excuse my overenthusiasm and the excessive number of pictures in this post. I'm excited, which will become obvious soon.
To start the day (since I'm, evidently, a glutton for punishment) my wife and I went climbing here at Vertical World in Seattle. Super fun. We climb about once a week, and more if we can fit it in. To anyone reading I highly suggest giving it a go. Make sure and take a belay course from a certified instructor before going. Safety first! We might even go bouldering (rope'less climbing that's very technical and only extends up about 18' at the max with big crash pads underneath you in case you take a spill) tomorrow morning as well despite me having a four hour long rehearsal and more studio work to get done. Glutton for punishment, did I mention that?
The electrician is coming out on Wednesday, so I needed to get some work done in advance of that. In addition to wiring up the studio he's also running a 240V power supply to an infrared sauna we bought a while back that's been living in our tool shed ever since. Here it is about 2/3 of the way complete.
It's important to confirm that it will fit a human as large as I am. Upon thorough testing I'm pleased to report that it passed all examinations with flying colors.
All finished. We need to come up with a solution to hide the wood pieces I used to get it level in all directions, but effectively once there's a new 240V outlet for us to plug it into it will be ready to rock.
Now onto something that directly impacts the studio! I needed to dig a trench for the conduit that will extend from the electrical panel in my basement over to the studio. In the picture below you can see the beginnings of that trench. The vertical PVC pipe is at about the location we'll be popping out of the wall.
Here's the trench extending over to the studio. The sub-panel for the studio will live just inside the studio to the right of the entry door.
Per code the trench has to be 18" deep relative to the adjacent existing ground elevation. There are some old bits of concrete that I couldn't get out of the trench that are keeping the conduit up a little too high. As long as the electrical inspector is reasonable it shouldn't be a problem. If he won't allow it to pass inspection without being exactly per code I'll have to tunnel underneath the concrete as removing it won't be possible. Believe me... I tried...
1 1/4" schedule 40 PVC conduit in place in the trench.
Here's where it will enter the studio.
Needed to construct a 3/4" CDX plywood bridge so that patients coming to my wife's business can safely step over the trench. Plywood is tough stuff. I stood on the trench end and even bounced on it a little. The stuff barely flexed. I tend to forget how robust of a product it is.
My wife had a good laugh when I came in to eat dinner regarding the quantity of dirt on my face. More updates to come as the electrical gets going. Lots of progress on the horizon, and once again... I'm very excited about it.