My New Studio Build (perhaps overly detailed)

Vestibule ceiling drywall is done. As you can probably tell by the screw pattern it took me a while to figure out the best way to go, how to properly use the drywall screw setter to countersink the screw heads and most importantly, how to land on a stud without just popping into an insulation filled bay :p

254BFE69-4255-47FC-A443-DE87810B0A16.jpeg
 
Some people call a vestibule a mud room. Maybe it has something to do with the amount of joint compound used. :laugh:
To me a mud room is specifically an entryway to a house designed for taking off your shoes, jacket, etc. A vestibule, to me, is more of a non-specific entryway. Since mine is going to be used for storage (cases, cables, drums when not in use, etc. I thought it seemed more appropriate than mud room. I suppose foyer also applies :p
 
I got the entire north wall of the vestibule done once the ceiling was in place. That statement comes with a caveat.
7C501F8A-8A3A-4E99-9934-CFA8628E1E12.jpeg


The last triangle piece for the vaulted ceiling is SLIGHTLY too large and wouldn’t squeeze itself into the hole. I tried firing some screws in it with the hope that it would suck itself up tight enough to the framing that it would fit, but... No dice. It’s late enough that I decided to deal with it tomorrow. I’ll pull it down, shave it down a hair and then throw it back up.
F7F06F5A-0752-4AB6-AD49-EA95F6D28E76.jpeg
 
To me a mud room is specifically an entryway to a house designed for taking off your shoes, jacket, etc. A vestibule, to me, is more of a non-specific entryway. Since mine is going to be used for storage (cases, cables, drums when not in use, etc. I thought it seemed more appropriate than mud room. I suppose foyer also applies :p

I think that vestibule is well chosen for this application.

a passage, hall, or antechamber between the outer door and the interior parts of a house or building.

 
Finally got confirmation from the engineer that the truss will be able to support the ceiling isolation assembly. The bottom chord of the truss will safely hold 14psf, but you have to back out 2psf for the self-weight of the truss leaving us with a safe capacity of 12psf. My assembly clocks in at 9.44psf, so I should be good.
 
While I thought about the next phases of work on the studio today at my office when I should have been thinking of THAT kind of work I decided that I needed a dedicated run of time to really make some serious progress on the studio. To that end I just scheduled a week of vacation time at the end of March to get it done. That will give me nine days to work on it with only as much interruption as I decide to allow into the mix.
 
Most minor of updates: I rearranged the stacks of drywall and plywood so that I can begin installing both leaves of the lid. It turned out to be a much larger effort than if anticipated. Unfortunately, due to the limited space I’ll need to rearrange the material stacks as the area I’m attempting to work in moves across the structure. Fortunately the stacks will continually get smaller, but it’ll still add to the difficulties. I’ve got a four day weekend coming up, so hopefully I’ll be able to rack up some progress.
 
  • Like
Reactions: TheEmptyCell
I'm already going to be hanging tons of Whisper Clips and hat channel. RSIC channels (both the 1 and 2 leg variety) are inferior products in terms of isolation to what a Whisper Clip offers.

As for hanging heavy things on them, yes. Drywall. Lots and lots of drywall. When you look at the PSF of drywall and compare it to things like monitors, which I won't be wall-mounting, or mini split units, which I will be wall-mounting, you quickly realize that as long as you can handle the drywall you're good to go on anything else. I might need to throw another couple pieces of hat channel on some additional Whisper Clips to get the mounting for the mini split in-place, but that should be a breeze.
 
  • Like
Reactions: beans-on-toast
I'm already going to be hanging tons of Whisper Clips and hat channel. RSIC channels (both the 1 and 2 leg variety) are inferior products in terms of isolation to what a Whisper Clip offers.

As for hanging heavy things on them, yes. Drywall. Lots and lots of drywall. When you look at the PSF of drywall and compare it to things like monitors, which I won't be wall-mounting, or mini split units, which I will be wall-mounting, you quickly realize that as long as you can handle the drywall you're good to go on anything else. I might need to throw another couple pieces of hat channel on some additional Whisper Clips to get the mounting for the mini split in-place, but that should be a breeze.

Who are you kidding. Nothing you have done thus far has been “a breeze”.
 
Which do you think will be more of a workout, hanging a room full of drywall or rock climbing?
Since I’ll be using a drywall hoist for the really challenging lifts I’m going to say rock climbing. That said, I typically climb for 1.5-2 hours, or sometimes 2.5-3 hours if I’m belaying more than one person (ie my time between climbs is longer than with just a single partner), whereas drywalling will be an all day, if not multiple day affair. Marathon versus a sprint analogy perhaps?
 