Hi,
I raised the bridge adjusters as far as I thought I could (to where they make contact with the bridge), but it's still not as high as I would like. I thought that I had run out of room, but my teacher was telling me today that I can continue to raise it higher. There is very little gap between the adjusters on either side (i.e. foot side and bridge side), so it's not like the adjusters are going to pop out of the feet or anything.
Just wanted to double check here before I go and do this. Initially I thought I needed a whole new bridge, but seems like I can save the expense if I can just raise it from here.
Thanks
I raised the bridge adjusters as far as I thought I could (to where they make contact with the bridge), but it's still not as high as I would like. I thought that I had run out of room, but my teacher was telling me today that I can continue to raise it higher. There is very little gap between the adjusters on either side (i.e. foot side and bridge side), so it's not like the adjusters are going to pop out of the feet or anything.
Just wanted to double check here before I go and do this. Initially I thought I needed a whole new bridge, but seems like I can save the expense if I can just raise it from here.
Thanks