hey guys, i'v ebeen going about this for the last 4 hours and so far, only one side is pretty flush (treble side of headstock/neck) in dry fitting them. The bass side still needs a little work, but what gives!!! After 4 hours, i figured having it all leveled smooth and everything would be flush dry tested....
p.s. the picture with the c clamp in plain view, the pieces are flush together, just a part of the small paddle blank that came off but, it's all flush together in this dry fit.
p.s. the picture with the c clamp in plain view, the pieces are flush together, just a part of the small paddle blank that came off but, it's all flush together in this dry fit.