Glad to hear of them out in the wild. You’re satisfied with the performance of the door and its seals then?

Very satisfied, it was a real bear installing 300lb+ door. It works great. I have yet to put in the floor seal as the door still leads to the unfinished part of my basement, so the flooring ends at the door. That’s this years winters project.

Ideally you have two staping helpers who’ve installed doors before helping you.
 
Very satisfied, it was a real bear installing 300lb+ door.
Excellent. Nice work getting it in yourself as well!

I have yet to put in the floor seal as the door still leads to the unfinished part of my basement, so the flooring ends at the door. That’s this years winters project.
Looking forward to progress pictures. If I'm understanding correctly it sounds like you're not using the included threshold and still getting good performance. Is that right?

Ideally you have two staping helpers who’ve installed doors before helping you.
I was planning on hiring it out to my door contractor, but if it's simple enough I might take it on myself. I've got some guys in mind that could help.
 
@peterpalmieri

Did you go with the IsoDoor Basic, IsoDoor, IsoDoor HD or IsoDoor HD LF? I'm going with the full blown HD LF model (better performance at and below 50hz than the HD with a slight sacrifice in the 125-400hz range).

Isodoor. There were to many compromises in how I was able to isolate the rest of my room that didn’t justify the added expense.
 
Excellent. Nice work getting it in yourself as well!


Looking forward to progress pictures. If I'm understanding correctly it sounds like you're not using the included threshold and still getting good performance. Is that right?


I was planning on hiring it out to my door contractor, but if it's simple enough I might take it on myself. I've got some guys in mind that could help.

That is correct. I’d highly recommend a contractor. It wasn’t fun and my brother in law has been doing contracting on the side for 20 years. Without his help it would have been rough.

I have not installed the threshold because the flooring and subfloor stop at the outside edge of the door and since the floor is floating II need the other side to attach it too. The sweeper on the bottom of the door is adjustable so I’ve got it set low now to make contact with the floor. I can raise it to get clearance for the threshold when I’m ready.
 
Limited time to prime tonight, so I was hustling.

West wall is finished
9DE9EF89-B7B7-46BC-946B-8DEEE0573C9A.jpeg


East wall framed
2DEB0E1A-10F8-49CA-B352-9FBE2FE7F5FE.jpeg


East wall finished
36112EFB-FE6E-4414-BB50-30D6CFDD1319.jpeg


South wall framed
FBF46D41-7579-42C6-B729-3D86C7B90A0A.jpeg

South wall finished
0AC33660-21C1-47E1-A606-2BE82E54BC95.jpeg


Main room priming is complete. Tomorrow night I should be able to knock out the vestibule. I should be able to paint this weekend. Wallpaper for the main room ceiling arrives on Tuesday.
 
Once the paint is done I can hang the HVAC components. With that and the lighting I need to pick out and procure I’ll be done with the electrical and HVAC contractors. That will only leave the door contractor as the remainder of the third party support needed to get this finished. I’ll be very happy to be done with contractors and only be beholden to my own schedule.
 
Once the paint is done I can hang the HVAC components. With that and the lighting I need to pick out and procure I’ll be done with the electrical and HVAC contractors. That will only leave the door contractor as the remainder of the third party support needed to get this finished. I’ll be very happy to be done with contractors and only be beholden to my own schedule.
Happy to hear about the progress. Really looking forward to the result!
 
I didn't get a chance to prime last night, so I'll be going full force at it tonight. The goal is to completely prime the vestibule. It's a small space, so I'm optimistic. Tomorrow night, after getting back from having a fractured tooth repaired (ouch!) I'm going to pick up all of the paint so I'll be ready to tackle that over the weekend.
 
Its amazing how fast its going, for years it was fits and starts but now it's very steady the progress, this thread is really a nice treat every morning.
Funny how big a difference having all the money on-hand to get it done makes progress happen :p

...not to mention permit hangups... contractor delays... horribly taxing solo drywall efforts...
 