Heavy indeed! 10-10.5psf.Seeing it makes one appreciate that it’s going to be a pretty heavy ceiling.
Since the ply will be carrying many layers of plasterboard, were there extra fasteners required in the ply over what is used for the plasterboard?
Is there a spec for how many fasteners are required per sheet?
I’m now regretting not pushing for what’s known as a “warm roof.”
I only learned about the need for a middle leaf necessity after a lengthy discussion with a master builder over at the John Sayers forum. In other words; I would have needed a time machine in order to correct for the issue. The middle leaf was the most reasonable solution.Most people, especially those that are doing the work themselves, second guess at every stage. You have to make decisions to move ahead.
I did not. There’s going to be a fair amount of variation in the plywood. The drywall should be pretty uniform. None of the variation will amount to an additional 1.5psf, so I’m not worried about it. Additionally there’s an engineering safety factor built into the 12psf limit, so I”m doubly not worried about it.By any chance, did you weigh a plywood and a drywall sheet to see if they meet their specs?
Repeatedly relocating stock seems to take up a lot of time and effort.
I suppose that you are way past this but I see rented small sized shipping containers being used where people are renovating their homes. They must be expensive though.
View attachment 2971633
Not applicable to your project, but I had a great experience with portable storage containers, I used PODS (PODS Portable Storage Containers and Storage Units) but there are others. They deliver the container, you load it up and they pick it up when you're done. Very inexpensive compared to buying storage units. Would work great for a project where you have a parking area nearby.The cost and space of having a container on-site just doesn't make sense for this project.

The vestibule sub floor is already finished. I had to do that floor before I put up the drywall in that space. Floor, ceiling, walls, in that order.Is the vestibule being done as well to keep the floor at the same level as the studio proper?
If by "glued" you mean "Green Glue'd" then yes it is. You never use screws for any kind of flooring underlayment. Instead you use underlayment nails, which are a specific kind of ringshank nail that has a much higher shear strength than a screw while still providing sufficient pull-out resistance courtesy of the rings around the nail's shaft.Is the floor being glued and screwed?
You never use screws for any kind of flooring underlayment. Instead you use underlayment nails, which are a specific kind of ringshank nail that has a much higher shear strength than a screw while still providing sufficient pull-out resistance courtesy of the rings around the nail's shaft.