My New Studio Build (perhaps overly detailed)

Per the manufacturer; As long as your distribution pattern is relatively even everything will spread out effectively. Their product videos show an even clumpier version of what I did here. My subsequent panels got better in terms of even distribution.

Also per the manufacturer; If you keep 1-2” clear from the edges you want have any oozing issues.
 
  • Like
Reactions: beans-on-toast
First layer, plus half of the second is up on the eastern half of the lid.
A233BDD9-A586-45C5-88EB-9D70688EB05F.jpeg
 
  • Like
Reactions: IconBasser
The last task before calling it a night was to have my wife help me snap chalk lines along the trusses so I can attach the Whisper Clips to that half of the ceiling without being able to see the trusses. We were able to see them at the ridge and at the connection to the double top plates at the wall tops, which made it pretty easily.

Feeling good! Tired... but good! :smug:
 
I definitely overdid it yesterday. My cold symptoms came flying back today. I felt a little better earlier and made some progress, but petered out quickly. I’m now laying on a couch with no intention of getting anything else done today, studio or otherwise :p

I managed to finish moving my stockpiles around for the next phase of work, got rid of a bunch of cut pieces of plywood and drywall, finish off another section of subfloor (LP 3/4” TG composite plywood attached to the substructure, Green Glue, 11/32” plywood underlayment), and test fit a couple Whisper Clips. I did the test fit since I’m going through more material than is typically called for due to my need to have a middle leaf on the ceiling. As such I stepped up the screws to #8 x 3” since they have to go through the 5/8” drywall and 15/32” plywood before hitting the truss. Fortunately they sunk into the truss without too much effort (#8 screws are no joke!) and the clip felt rock solid as a result. I installed two clips and will leave them until the rest of the lid and subfloor are finished so I can see if the drywall compresses under them, or if they’re good to go as soon as they’re installed.

Hopefully I’ll be back at it tomorrow.

47B1214B-CFEF-4758-A88F-2022FA1929A9.jpeg
 
Finally back to it. My cold ended up being strep throat. Yesterday I probably could have gone back to work, but I opted to take another full day of rest and recovery so as not to re-aggravate symptoms. So out of a 10 day vacation from my day job I’ll get, at most, 3.5 days of work on the studio. First the work was interrupted by permitting, then by building delays, then by funding, and now by illness... the universe really doesn’t want me to finish the project! No pity party though. Time to buckle down and knock this thing out!

I finished a big portion of the second layer of sub flooring. There’s a huge amount of mass below the sub floor (many feet of crushed rock, concrete blocks, steel, and Roxul) but I still wanted to get a layer of Green Glue underneath the flooring. To do that I’m installing 11/32” plywood underlayment on top of the original sub floor with Green Glue in between the layers and the preferred two tubes per 4x8 sheet distribution. My footfalls between areas I’ve finished and ones I’ve not sound remarkably different. It could just be the difference of two layers, it could be the GG, or likely a combination thereof. Either way I’m optimistic this added effort will be worth it in the long run.
2A0A5AA2-5193-42E4-940E-705DFB341115.jpeg
 
Seeing it makes one appreciate that it’s going to be a pretty heavy ceiling.

Since the ply will be carrying many layers of plasterboard, were there extra fasteners required in the ply over what is used for the plasterboard?

Is there a spec for how many fasteners are required per sheet?