My New Studio Build (perhaps overly detailed)

You just saved yourself a lot of grief and money. Keep trusting your senses.

The number of screw-ups, design changes, and longer than expected lengths of time it takes to get things done on all of this have been really disheartening. I’m going to attempt to pick it up again tomorrow, but man... Keeping your spirits and motivation up is much more difficult than lifting full sheets of drywall.
 
  • Like
Reactions: beans-on-toast
The number of screw-ups, design changes, and longer than expected lengths of time it takes to get things done on all of this have been really disheartening. I’m going to attempt to pick it up again tomorrow, but man... Keeping your spirits and motivation up is much more difficult than lifting full sheets of drywall.
Focus on your goals! It will get done.:-)
 
This was the moment that I realized I was an idiot and bought screws that were too long. The inner leaf is short circuiting into the middle leaf, effectively negating any sound isolation benefits. I now have to tear down all of the inner leaf and start it over with shorter screws.

:banghead::banghead::banghead::banghead::banghead:

View attachment 2999795
You can back out and replace one screw at a time without a tear down. I never would have trusted a contractor to correct this kind of mistake.
 
  • Like
Reactions: IconBasser
You can back out and replace one screw at a time without a tear down. I never would have trusted a contractor to correct this kind of mistake.
Agreed. There’s no way a contractor would do this correctly.

Backing one out a time was a thought, but after trying a couple the result were less than pleasing. I tore it all down and started over.
 
  • Like
Reactions: peterpalmieri
Previous attempt torn down and progress restored. Time for lunch.

9004D944-9754-47A1-B680-A639AE991A6A.jpeg
 
...also... I was having trouble with the butt seam where two panels meet on a piece of hat channel since the face of the channel is only 1 1/4” wide (ie that leaves a paltry 5/8” of surface from the edge for each panel). I was getting cracking at the edges of each panel and a less than secure grip on the channel. I found a few posts where people describe adding another channel row and giving each panel a dedicated row for its edge. Very smart. I’ll be throwing those up after lunch.
 
Next I need to relocate my drywall stockpile so I can keep working on the first layer of the inner leaf. I’ll be moving said stockpile tomorrow night after work, and will continue installing drywall on Tuesday evening. At this rate I’m hopeful that by the end of the coming weekend the first layer of the inner leaf will be done.

Alternatively; If I can creatively move just enough of the stockpile to set the next panel on the lid I can then go back and begin installing the second layer on the inner leaf, then lay up the south wall and the southern half of the east and west walls. That will minimize the number of times I have to move the stockpiles. We’ll see if I’m smart enough to pull off such a feat.
 