• TalkBass has been independent since 1998. Add your voice.
    Create a free account to reply to discussions, view embedded media, and browse with fewer display ads.
    Join freeLog in
    Want zero display ads or expanded classifieds tools? Compare plans.

My New Studio Build (perhaps overly detailed)

So excellent to see this progress! I'm sure it still feels like it's taken forever, and that there's still forever to go, but the amount you manage to get done with every new post is impressive.

Have you decided on the interior design scheme?
 
Have you decided on the interior design scheme?
Only in so much as the floor will be a laminate wood product that's not too dark, the walls will be painted some color, the trim will be really big and white, the electrical fixtures will be oiled bronze, and the acoustic treatments will have a wood facing of some sort. Well... Either that or what @Microbass has suggested :p
We went over this a few posts up... Hipster vibe... insulation on view to act like potarto sacks... ;)

Is there green glue between the 2 layers of the inner leaf?
Yep. Two tubes per 4x8 sheet, or in the case of my eave to ridge dimension, two tubes per 48x81 sheet.
 
  • Like
Reactions: TheEmptyCell
I’ve got something similar in my sunroom. The lights in the studio are track lighting so I can customize the brightness and angle as needed. I still need to pick out the fixtures.

I’m just being a pest tbh..! When I’ve been in a studio I want a professional look and feel - no gimmicks. Puts everyone even after they’ve done their bit that they are there for a reason. I know you’ll put in what you think is right it’ll be an amazing place to go record in.

Makes think you’ll need to host a GTG for a a rainy BBQ and some beers!
 
  • Like
Reactions: DrewinHouston
With any lighting, it’s important that the fixture be solid enough that it doesn’t vibrate or rattle.

I had six standard size (E26) LED bulbs that must have been susceptable to vibration. The bulbs were expensive and had a long life warranty. They only lasted about two months. Unfortunately, I didn’t keep the paperwork or receipt.
 
Last edited:
Green Gluin’

ECDF4995-605E-4CF7-91DF-B79A27762C25.jpeg
 
  • Like
Reactions: TedH
Making progress. I suspect I underestimated the amount of hat channel this project will need. The end walls (north and south) have a lot more cuts/waste than I’d expected, so I’m going through boxes at a scary rate. Some of the cuts will be used to join full pieces on the longer side walls (east and west), but still... might need some more. Better do a check of clips and putty pads too!

666F0985-58CD-4171-ABF7-B83845B1E96B.jpeg
 
Last edited: