I was hoping the fire blocking wouldn’t be an issue. Damn.That was something I had considered. I’d need to bust out the fire blocking in order to do so, but it’s a definite possibility. I was hoping someone would have a brilliant idea that I’d simply overlooked. Not seeming like that will be the case here.
Fire blocking is easy to bash out with a framing hammer. It’s just a 14 1/2” long 2x6 held in place by a couple of toe nails on each end.I was hoping the fire blocking wouldn’t be an issue. Damn.
Good luck. I hope a better solution surfaces soon.
Just a small blip in the continuum. You’ve solved and re-worked bigger problems. You’ll enjoy the studio pretty soon. Keep the faith.Fire blocking is easy to bash out with a framing hammer. It’s just a 14 1/2” long 2x6 held in place by a couple of toe nails on each end.
I was hoping for an obvious solution to reveal itself, but...Looks like I’m buying an 8’ long 2x6 tomorrow, setting up my chop saw, removing two bay’s worth of insulation, busting out a piece of fire blocking, using a jig saw to notch out for the already installed electrical, toe nailing and sistering one stud to another, mounting the wall bracket, reattaching the fire blocking, replacing the insulation, and... I don’t know... crying a little![]()
Your positivity is sincerely appreciated. Marching onward!Just a small blip in the continuum. You’ve solved and re-worked bigger problems. You’ll enjoy the studio pretty soon. Keep the faith.
Nice straight grain...
Thanks! Definitely a lot of recent progress. Now with the lid finished I feel like the pace will only continue to increase.I know it’s been a slow and tough graft over the last few months but I feel this has been a massive step forward this past week and a bit.
I’m still in awe that I found this thread late 2017 and you were shifting tons of particular types of gravel in 2015 while battling nonsense with the council and here it is so far. If I’m ever in Seattle...!!
I agree that it’s taken too long, but things like overall financing, permit hang-ups, and attempting to have a life outside of construction all delay things. Hiring it out would have been faster, but. not cheaper. Not by a long shot.I've read 93 pages of studio build.
To me this project has taken way too long to complete. Three years and counting. IMHO, money spent on distractions could been spent on hired help and the project might of been finished. Additionly we might of had 60 pages.
The construction details and photos are nice.
This is the least helpful, most pointlessly rude post I’ve ever seen on TalkBass.I've read 93 pages of studio build.
To me this project has taken way too long to complete. Three years and counting. IMHO, money spent on distractions could been spent on hired help and the project might of been finished. Additionly we might of had 60 pages.
The construction details and photos are nice.
I've read 93 pages of studio build.
To me this project has taken way too long to complete. Three years and counting. IMHO, money spent on distractions could been spent on hired help and the project might of been finished. Additionly we might of had 60 pages.
The construction details and photos are nice.
The permitting process and it's delays are a fact of life,I agree that it’s taken too long, but things like overall financing, permit hang-ups, and attempting to have a life outside of construction all delay things. Hiring it out would have been faster, but. not cheaper. Not by a long shot.
Money spent on distractions is a bit condescending. What constitutes a distraction?