I can probably announce what the lineup will be for December ordering, I'm planning to open the batch up next week, most likely the 15th (because why not).When do you plan on announcing your December builds?
The new additions for December batch will be:
- Dreamcatcher
- Echosaurus Valve
- Glass Butterfly
- SMD UA and SMD Slampegg layouts will move to the same configuration as the HW designs with the tube moved to one side instead of the middle. As I work my way through all my designs for "best engineering practice" it makes more sense from a layout perspective to do it this way. It also eliminates the need for me to maintain two different versions of the CNC drill files and two different versions of the UV print files.
They do, but I'm not there yet. It's been kind of frustrating working up to it slowly, my original plan was to switch over to pre-made enclosures in July, and that didn't happen. Now I'm shooting for January, we'll see what happens there.I assumed the pre-finished enclosures also came pre-drilled. Of course, you could also drill an extra hole yourself in that case. I was just overcomplicating for the sake of whiteboarding. Don't mind me.
