• TalkBass has been independent since 1998. Add your voice.
    Create a free account to reply to discussions, view embedded media, and browse with fewer display ads.
    Join freeLog in
    Want zero display ads or expanded classifieds tools? Compare plans.

Wal Bass Club.

someone of FB Wal page post pics of a HQ visit and noticed this in the background. anyone know anything about this? someone's refin perhaps??

ProRefin.png
 
  • Like
Reactions: Caca de Kick
Sent an inquiry to Paul, looks like they raised the prices once again. If they are just going to keep raising the prices, should I just go ahead and pay in one whole payment?

once you put a deposit down it locks in the current rate. @LowEndHum no need to pay for it whole. the only benefit i would see in making a whole payment is the exchange rate. so for example if you paid in full today a Mk2 for £5800 it would yield $8085 in USD. However the exchange rate changes daily between £ to $ (depending on the market), so as you make payments, you could either end up paying more...or even less.
 
Last edited:
  • Like
Reactions: LowEndHum
sure enough it did go up (i didn't have the previous rates 6 strings noted):

The base price for each model is:
Mk1 4-string – from £5300 -> £5550
Mk2 4-string – from £5500 -> £5800
Mk2 5-string – from £6050 -> £6400
Mk3 4-string – from £5500 -> £5800
Mk3 5-string – from £6050 -> £6400
Mk3 6-string – from £6800
 
Last edited:
sure enough it did go up (i didn't have the previous rates for the 5 and 6 strings noted):

The base price for each model is:
Mk1 4-string – from £5300 -> £5550
Mk2 4-string – from £5500 -> £5800
Mk2 5-string – from £6400
Mk3 4-string – from £5500 -> £5800
Mk3 5-string – from £6400
Mk3 6-string – from £6800
...do you think used prices likely to increase too then(?)....
 
  • Like
Reactions: LowEndHum
Shall I just purchase sometime before prices go up again? I mean, it makes sense to purchase something where the value goes up before it gets too crazy (like BTC).

I think it makes sense to order asap if you know you want a new one. I was looking for a long time at used Wal's and saw they were selling for round about the price of a new build, so for me it was a no-brainer. Plus it makes you feel better about making the order when the prices shoot up...
 
  • Like
Reactions: LowEndHum
Shall I just purchase sometime before prices go up again? I mean, it makes sense to purchase something where the value goes up before it gets too crazy (like BTC).

i placed my first initial deposit for my first build back in February 2015 of £500 when standard pricing for an Mk3 was £4250. I had initially thought of getting a build down back maybe 2013/2014 when standard pricing was £3650....got pissed at myself for waiting. sit on it all you want but perhaps in another 8-10 months another increase will occur - my recommendation put a deposit down at the very least and worry about final spec later.
 
my recommendation put a deposit down at the very least and worry about final spec later.
the caveat to this though, the options may also have increases (ranging from 2%-8% from what i gathered).....so if you wanted to get gloss on the body and didn't get it spec'd out originally..... but then decided to get it later AFTER a price increase, you'll be subjected to the current pricing.... so spec it all out with everything you "might" want and cross out if need be.
 
someone of FB Wal page post pics of a HQ visit and noticed this in the background. anyone know anything about this? someone's refin perhaps??

View attachment 2881673

You can also see the natural body hanging next to it is an early 80's Pro2 rear loaded version, it has the holes for the slide switches and toggle switch. This corner must be Paul's repair corner.
 
once you put a deposit down it locks in the current rate.

Is that true? Wow...
I mean, for the buyer that's great...but for Wal that seems just slightly short-sighted. I know a lot of other custom/boutique builders (of various products, not just basses) whose policy is that the deposit simply locks in your place in the queue, but the final price is determined at the time of the actual build, not the time of the deposit.
 

Latest posts