Hey now.. a friend is trying to locate AudioKinesis at NAMM.. What booth can we be found??
thanks
thanks
TalkBass has been independent since 1998. Add your voice.
Create a free account to reply to discussions, view embedded media, and browse with fewer display ads.
Join free Log in
Want zero display ads or expanded classifieds tools? Compare plans.
Hey now.. a friend is trying to locate AudioKinesis at NAMM.. What booth can we be found??
thanks
Hey now.. a friend is trying to locate AudioKinesis at NAMM.. What booth can we be found??
thanks
nyuk nyuk nyuk
What is the lead time on these cabinets, just generally.
Right now, I'd estimate ballpark twelve weeks. So probably not as bad as having a custom bass built, but soitainly a LOT longer than I'd like.
My wife and I talked it over and in a few weeks she'll have the opportunity to start dialing back the time she spends at her regular jobs, and we're going to convert a space into a painting room such that we'll have a glue-up room and a painting room so both can be happening at the same time. She used to do surface-prep and Duratexing back when we lived in Idaho, and she's better at it than me (sorry about that, all my customers over the past two years!). Working together we can probably get those delivery times to come down from "awful" all the way down to merely "bad".
It will be several weeks before she's able to trade a day or two of regular work each week for a day or two of Duratexing delight, but if that goes well, we can probably continue to move in that direction.
"...he was a hard-headed man, he was brutally handsome, y'all...and she was duratexing
Getting that next line to work is hard though.
EDIT: With no context given, I asked my teenage son--not a real morning person--to quick, give me a word that rhymes with "cabinets." He said "Dragnet? Bassinets? Crab Nets? I don't know...that's a hard one."
Maybe I've done enough.
reckon if you can keep ship date hovering at 12 weeks after receipt of deposit, you're golden.My wife and I talked it over and in a few weeks she'll have the opportunity to start dialing back the time she spends at her regular jobs, and we're going to convert a space into a painting room such that we'll have a glue-up room and a painting room so both can be happening at the same time. She used to do surface-prep and Duratexing back when we lived in Idaho, and she's better at it than me (sorry about that, all my customers over the past two years!). Working together we can probably get those delivery times to come down from "awful" all the way down to merely "bad".
It will be several weeks before she's able to trade a day or two of regular work each week for a day or two of Duratexing delight, but if that goes well, we can probably continue to move in that direction.
With a few things switched around, I pretty much have the best rig I could imagine now. No amp/cab GAS whatsoever for the foreseeable future.
View attachment 2890956
With a few things switched around, I pretty much have the best rig I could imagine now. No amp/cab GAS whatsoever for the foreseeable future.
View attachment 2890956
"Foreseeable?" Never, I'd think. That's a >99.999% set up right there. Maybe you will decide you need an M2500.
Awesome stack - nice job.
No beers or liquids of any kind near this rig!droolWith a few things switched around, I pretty much have the best rig I could imagine now. No amp/cab GAS whatsoever for the foreseeable future.
View attachment 2890956
I’m at the 12 week mark right now with, hopefully, only a week or so left. I had a feeling ordering over the holidays would lead to delays though.What is the lead time on these cabinets, just generally.
LOL, although I actually did give the booth slaves a stern lecture about leaving liquids on top of the rig. The booth was extremely cramped this year, with 25+ instruments in a nominal 10 x 10 foot space, including cases, stands, a big table, and the obligatory coffee maker.How did the upfiring tweeter survive with all the drinks spilled into it?