Tonight I got some work done on my passive LoBue.
First, I routed out the body.
Something happened while routing. I'm not sure what happened, but I will need to employ some epoxy to fix it.
Template removed.
Lessons learned about order of operations prompted me to work on the control cavity, first.
Basically, all shaping should be done BEFORE mounting the neck.
Lining up the area to rout.
Next, I took my template sheet to mark where the pot shafts should be drilled.
Next, I routed my control cavity. I thought I had routed enough, but test fitting my pot showed I needed to keep going.
After some deeper routing, she's looking good.
Last step tonight was to route the control cavity cover inlay.
I'm done for tonight!
First, I routed out the body.
Something happened while routing. I'm not sure what happened, but I will need to employ some epoxy to fix it.
Template removed.
Lessons learned about order of operations prompted me to work on the control cavity, first.
Basically, all shaping should be done BEFORE mounting the neck.
Lining up the area to rout.
Next, I took my template sheet to mark where the pot shafts should be drilled.
Next, I routed my control cavity. I thought I had routed enough, but test fitting my pot showed I needed to keep going.
After some deeper routing, she's looking good.
Last step tonight was to route the control cavity cover inlay.
I'm done for tonight!