My gear is ready to go. What I'm working on now is fine-tuning the set-up and tear-down process to reduce the time, exertion, and number of steps it takes to complete each step.
I installed large locking casters on my main cab. After removing my main cab from the car, I stack my second cab and rack on top, cinch everything in place with a quick-release strap, roll cabs and rack case into position on stage, and lock the casters; I used a quick-release strap just in case I have to schlep my gear up or down stairs, one piece at a time.
I'm in the middle of designing a "briefcase" with demountable hinges. After unlatching, the top and bottom will separate from one another. The top will contain cord storage and a multi-outlet box, the bottom will contain a pedalboard in two-pieces; piece A will contain my "always on" components and sit on top of my rig, and piece B will house pedals I operate during gigs and sit on the deck.
I've been considering installing my wireless transmitter in a cavity in my bass to make set-up and tear-down quicker and easier, and reduce, by one, the number of cords I have to mess with.
My bandmates and I are continually looking at the way we store, haul, set-up, and tear-down our band gear to save time and reduce the likelihood of a hernia. The way we look at it, the quicker we can set up and tear down, the more we make per hour.
It's a never ending process!
