Anyway, the solution is to drill out the old holes then plug the holes with wooden plugs of the same diameter. Re-drill screw holes and reinstall bridge with better grade screws.
Use maple plugs. If your bass body is softer wood like basswood, installing hardwood plugs should eliminate the problem for good.
Edit: I forgot, secure the plugs in the hole with wood glue and make sure they don't interfere with the bridge's mounting surface!
Use maple plugs. If your bass body is softer wood like basswood, installing hardwood plugs should eliminate the problem for good.
Edit: I forgot, secure the plugs in the hole with wood glue and make sure they don't interfere with the bridge's mounting surface!
Last edited: