My New Studio Build (perhaps overly detailed)

It's not hard to hang a door. Doesn't matter what kind of door. Even in comparison to all of the other stuff you've done. I bet there's even a youtube video showing you how. Yup, here's one, not your brand but it can't be much different.

 
It's not hard to hang a door.
That may be the case, however the alarming number of doors I've seen that were either not hung square and plumb (i.e. they constantly try to open or clothes themselves), or ones that don't have an even seal all the way around makes me think there's a difference between hanging the door and hanging it well. Since isolation doors are so particular when it comes to getting the seals right, I'm going to enlist the help of a professional.
 
Weekend construction plans:
  • Remove all of the flooring shims
  • Sweep and clean the installed flooring
  • Put down construction resin paper over all of the flooring
  • Relocate everything back into the vestibule
  • Install the HRV
The HRV might be a partial install depending on how the internal power connection works. If it's a restrained joint that I can disassemble so as not to need a power plug (i.e. it can be hardwired), then I'll be going that route. If not I'll just hang the thing and be done with it. There's also a small control box that's supposed to be recessed into the wall. I missed that part when I was hanging drywall, so I'm going to make a nice wood box and surface mount it.
 
  • Like
Reactions: TheEmptyCell
Damn weather forecast... :meh:

My initial plan today was to install the HRV. The weather forecast changed and said it was going to rain most of the day. Based on that, and not wanting water to get into the two 5” holes I have to drill in the north wall for the HRV I decided to postpone. Hasn’t rained a drop all day!

Oh well. At least I got the flooring covered with construction resin paper to keep it from getting scratched up as I come down the final stretch.

7A96EA48-EEAC-4111-86A1-E014A6D32670.jpeg
 
Working on the HRV today. I’m currently on-hold waiting for my drill to cool down. It started smoking, so... :eek:

5” hole saw for the two required holes.
56FD5BA7-4507-48FE-B6FF-2815F5A700F2.jpeg


Through the drywall.
1A31B259-3060-48C9-9601-FA27093C5997.jpeg


Extensions are scary.
EA1EEA24-4B36-486F-B357-072969B90D57.jpeg


I can see daylight, and the cutout is flexing, but the drill is having one heck of a time getting through the Hardiplank siding, which is a mixture of wood and concrete.
7584A637-C3AA-454A-B727-6D573DFAABBC.jpeg
 
  • Like
Reactions: TheEmptyCell
When they put in the tankless water heater, they needed to drill a big hole through the concrete wall. The air in and air out are via the same hole.

They subcontracted out to a guy who cut holes in walls for a living. He had a huge drill and a monster bit. IIRC the hole was 6" across.

I didn't see the bit, but it must have been some sort of huge hole saw since it left a nice clean plug of concrete. It did not have an index drill in the middle since the plug is complete.
 
My new 5" carbide hole saw is scheduled for delivery tomorrow. That means I'll be clear to finish the HRV installation over the weekend, assuming nothing else gets in the way.

In semi-related news; I had to deal with a $4,000 plumbing fiasco over the last two days. That's not the kind of dough you want to lay out when there's studio building to get wrapped up! :banghead: