Pickup cavities routed. Output jack drilled.
Final sanded.
Flooded with thinned penetrating epoxy , now to let it cook for several days in well ventilated 100 degree shelter / workspace.
Final sanded.
Flooded with thinned penetrating epoxy , now to let it cook for several days in well ventilated 100 degree shelter / workspace.
Last edited:

