I see this cab for sale, GC Used.
[Invalid or Expired Link Removed]
I did a TB title search, zero/nada.
This is the builder's site
Krunch Kabinets Music Gear
On the cab page, this is about that cab:
“This monster was custom made for Greg Chaisson. Greg has been loyal to his 8x10 since 1979. He was so taken back by the 212 he requested a 412. Well Greg was so pleased that we built him a second 412. Same great Celestion Neodynium BN12-300 speakers as the 212.”
It weighs ~95-lbs. Retailed for $1399.
Here's Greg Chaisson for whom the original cab was built.
greg chaisson - Google Search
Opinions please on whether or not this would be a good cab.
They had a GK 4x12, more expensive, similar in weight, but gone now, and I'm feigning for something between my 2x15 and two-410s stack.
Thanks sooo much.
[Invalid or Expired Link Removed]
I did a TB title search, zero/nada.
This is the builder's site
Krunch Kabinets Music Gear
On the cab page, this is about that cab:
“This monster was custom made for Greg Chaisson. Greg has been loyal to his 8x10 since 1979. He was so taken back by the 212 he requested a 412. Well Greg was so pleased that we built him a second 412. Same great Celestion Neodynium BN12-300 speakers as the 212.”
It weighs ~95-lbs. Retailed for $1399.
Here's Greg Chaisson for whom the original cab was built.
greg chaisson - Google Search
Opinions please on whether or not this would be a good cab.
They had a GK 4x12, more expensive, similar in weight, but gone now, and I'm feigning for something between my 2x15 and two-410s stack.
Thanks sooo much.
Last edited:
