• TalkBass has been independent since 1998. Add your voice.
    Create a free account to reply to discussions, view embedded media, and browse with fewer display ads.
    Join freeLog in
    Want zero display ads or expanded classifieds tools? Compare plans.

Summer Build Off 2022 - Get Ready!

Did a thing! Got some canary wood, should definitely have a couple necks between this and the padauk! Wanted just a small board to get a couple pieces, but this is what made sense to grab.

Also grabbed clamps, ordered a truss rod, and rasp from Solo Music, and a radiused ebony board from LMII
 

Attachments

  • PXL_20220621_151314498.jpg
    PXL_20220621_151314498.jpg
    1.2 MB · Views: 30
Not even a challenge.

A design next year for a friend is reminiscent of these.
I think a made a quick n dirty jig. If I remember correctly, I think it was just a cradle to hold 3 pieces at a time until the glue dried.
Kinda like this \_/
I still have them buried in the garage somewhere. When I make little cabs for the 8"ers I bought for the little class D amp I wanna get, I'll take pics.
 
Two Things:

1. turns out first day of summer is today this year. No idea why I put down June 22 except that's what Google told me months ago. My google-fu sucks. So the SBO will begin today. I updated the first post already.

2. I got called back into work today from vacation to address some urgent crap. Yay health care slavery! On top of that, I got spirited into a 1500h meeting that ends at 1600h. So then I have to drive home and post up the start thread. It will be closer to 1630h, my apologies. :D

The good news is, everyone gets an extra 23.5 hours! :thumbsup:
 
Two Things:

1. turns out first day of summer is today this year. No idea why I put down June 22 except that's what Google told me months ago. My google-fu sucks. So the SBO will begin today. I updated the first post already.

2. I got called back into work today from vacation to address some urgent crap. Yay health care slavery! On top of that, I got spirited into a 1500h meeting that ends at 1600h. So then I have to drive home and post up the start thread. It will be closer to 1630h, my apologies. :D

The good news is, everyone gets an extra 23.5 hours! :thumbsup:
Just my luck. SBO starts at 00:30 BST and I'm away all day tomorrow. I'll be home in time to take a wood pile photo but it will be too late to make any noise.
 
  • Like
Reactions: WRM and Beej
It is way past midnight here, and I'm in bed. But I'm wide awake, for (if my calculations are correct) the Build Off starts in half an hour!

So I'm running back and forth between my bed and my workshop, measuring, calculating. Do I have enough of this wood? Do I need to buy more? I haven't thought this aspect through very well, have I?

In other ways, I've prepared myself quite well. The new workshop is not fully finished, but usable. I've taken two weeks off work (from next Monday) and few appointments, so I can make a good start. I've also built two mockups.

And last but not least, I've told everyone around me what I plan to do, so there's no going back!

So now I'll jump in and hope for the best.
 
Two Things:

1. turns out first day of summer is today this year. No idea why I put down June 22 except that's what Google told me months ago. My google-fu sucks. So the SBO will begin today. I updated the first post already.

2. I got called back into work today from vacation to address some urgent crap. Yay health care slavery! On top of that, I got spirited into a 1500h meeting that ends at 1600h. So then I have to drive home and post up the start thread. It will be closer to 1630h, my apologies. :D

The good news is, everyone gets an extra 23.5 hours! :thumbsup:
Dammit, now I have to work overtime! :rage: Don't they understand the build-off is more impo'tent?!

I have to work through this incident with the staff then I'll ditch them and take care of this issue heah...