• TalkBass has been independent since 1998. Add your voice.
    Create a free account to reply to discussions, view embedded media, and browse with fewer display ads.
    Join freeLog in
    Want zero display ads or expanded classifieds tools? Compare plans.

The Sushi Box FX Secret Society

Just got a shipping notification for my pedal. Go to sleep, @Sushi Box FX. We can wait one more day.
I WILL DO NO SUCH THING. I CAN SLEEP WHEN I'M DEAD.

Seriously though, I was just getting shipping labels for the ones I finished tonight, I'm going to bed now. How well I sleep is inversely proportional to the amount of unfinished work I have and directly proportional to the number of pedals I've completed and have ready for shipping :cool:
 
I thought the Slampegg in Sushi's timelapse pedal build video was mine, right up until the end when he put black knobs on it. lol
Well and as a confession, it may have been two or three different builds throughout. I don't usually do just one at a time start to finish like the video implies, I do several of them all at once so the whole batch moves at about the same pace, and I didn't really have one set aside as "the one" for the video, it was just whichever Slampegg I happened to grab.

So yours could very well have been in there ;)
 
Ontario (Canada) today.
Woo Hoo.
9E4968D0-4739-4DAC-A834-1FDD50EF7462.jpeg


Happy Saturday. Thanks Nate.
 
Buying a $200 pedal in November and waiting until April to receive it is 100% not alright with me. That’s the only reason I haven’t tried one of these. That is way too long to wait for a pedal after having paid. If it was a custom bass or amp maybe, but not a pedal. How long before the wait is too long? I’d rather go without and have my money in my pocket.

I mean what could go wrong with owing $30k+ of merchandise to customers over the next 6 months in the middle of a pandemic and the worse economy that any of us will ever remember? I am sure that all the cases of small builders falling into absurd amount of troubles with the forum due to that same business model were due to all those guys having bad intentions at the start.
 
  • Like
Reactions: donahue
  • Like
Reactions: fivestringgecko
I mean what could go wrong with owing $30k+ of merchandise to customers over the next 6 months in the middle of a pandemic and the worse economy that any of us will ever remember? I am sure that all the cases of small builders falling into absurd amount of troubles with the forum due to that same business model were due to all those guys having bad intentions at the start.
Yup, that required a solid plan on my end. I keep a separate account with enough money to cover all the paid-for builds in it. I have a very lucrative day job so this has never been about the money, but I have to be careful with the money so I can continue to afford to do this.

Hey neighbor! I'm in Nebraska, but I know I'm further down on the shipping list :D

So I know pedals have shipped overseas. Who here can claim the 'furthest SB shipped' award?

I'm at 431 miles, here's a great easy straight-line site: Distance Between 2 Addresses, Cities or Zipcodes. (They come from Chicago, IL)
I think the furthest away was last month, Mullumbimby, Australia. That one will be hard to beat :P
 
I mean what could go wrong with owing $30k+ of merchandise to customers over the next 6 months in the middle of a pandemic and the worse economy that any of us will ever remember? I am sure that all the cases of small builders falling into absurd amount of troubles with the forum due to that same business model were due to all those guys having bad intentions at the start.

Being a small business owner myself...I can’t tell you how many small business owners shouldn’t be small business owners.
 
So I wanted to touch on a question a few pages ago, the robustness of the UV prints. So right now I have two UV printed boxes, one that was printed over the powdercoat and one that was printed straight onto the metal.

It looks like the ink doesn't bond very well with the metal, and I can easily scratch it off with my fingernail. I'm going to strip the whole think down and powdercoat it then re-print. The machine actually came with a "metal bonding agent" that I can mix with the inks to supposedly make them bond better, but I don't want to have to do that.

The ink bonds much better with the powdercoat, and on the powdercoated box I can't even scratch it off. I'm sure sandpaper would scratch it up, but I don't anticipate many people are frequently hitting their pedals with sandpaper during regular use.
 
Glad I could be your rebound pedal builder ;)

So this is something I've wanted to do for a while and finally got around to finishing it. I've had a lot of people ask me specifically how certain steps of my build process are done, or more just generally how I build pedals the way I do. Well to answer those questions I decided to film every step of the build process for one of the November Slampegg builds and speed it up to a watchable length of 6 minutes (the regular speed video is about 2 hours, nobody wants to watch that).

Oh and I decided it needed background music but I didn't want to deal with copyright stuff so I put in an original song without the vocals and looped it :)


Finally got around to watching this.
I like being able to see what goes into a product I'm buying or considering buying.

I saw the "UV/Laser Engraving" posts multiple times, but never really thought about it. After seeing a housing being engraved, I appreciate the thought and craftsmanship that goes into these pedals.
 
Finally got around to watching this.
I like being able to see what goes into a product I'm buying or considering buying.

I saw the "UV/Laser Engraving" posts multiple times, but never really thought about it. After seeing a housing being engraved, I appreciate the thought and craftsmanship that goes into these pedals.
Thanks :D I have the laser set up well enough that I can hit the button and walk away, but I still stay most of the time just because it's neat to watch :cool: The UV printer gives a lot better results and works a lot faster though, super excited to get that going next month.
 
  • Like
Reactions: dedpool1052
Thanks :D I have the laser set up well enough that I can hit the button and walk away, but I still stay most of the time just because it's neat to watch :cool: The UV printer gives a lot better results and works a lot faster though, super excited to get that going next month.
Plus all the fumes off the laser are pretty fun to... wait, like, what was I saying?