• TalkBass has been independent since 1998. Add your voice.
    Create a free account to reply to discussions, view embedded media, and browse with fewer display ads.
    Join freeLog in
    Want zero display ads or expanded classifieds tools? Compare plans.

My New Studio Build (perhaps overly detailed)

in hours how much time do you think it will take to finish?
Interesting question. A conservative estimate including pulling the floor paper, sweeping, moving my equipment in and setting up would be about 30-35 hours of work. I have three full days and three partial days free to work in 2018, so I've got just barely enough time to handle it all depending on how my recovery continues.
 
  • Like
Reactions: markjazzbassist
I'm just about to head out and make an attempt at doing some touch-up painting. My face is still sore, but I've been sitting around recovering so much that I think a little movement will do me good. Here's hoping this simple effort isn't too taxing.

Additionally, I had a brainstorm earlier. I can move in before having the vestibule completely finished. As such, I've revised my schedule and will be picking off this hand to-do list sequentially with the hope of beating the clock.

161F4C7B-6E80-4C81-96BD-F79A222E75F9.png
 
  • Like
Reactions: markjazzbassist
  • Like
Reactions: Microbass
Probably overkill, but adding child safety measures on all the outlets as a further means of sound isolation. I'm sure the measurable difference here I'll be zero, but it makes me feel better not having open holes in the walls.

View attachment 3254309 View attachment 3254310 View attachment 3254311

Might want to rethink this strategy. My experience was when I childproofed the studio (at my wife's request), pretty soon we had children. Net effect: noise floor significantly increased!
 
Might want to rethink this strategy. My experience was when I childproofed the studio (at my wife's request), pretty soon we had children. Net effect: noise floor significantly increased!
My wife and I made the decision not to have kids, and to that end I had a vasectomy in 2016. If I suddenly have kids you can bet that I'll have MANY questions to ask :p
 
In an attempt to steer the thread back in a non-genitalia'centric direction...

I'm back at my office for the first time since my surgery earlier in the week. I'm only working until noon and then I'm headed to Home Depot to pick up the sanding block I forgot yesterday. From there I'm headed home to sand the walls and ceiling adjacent to the trim to remove any excess silicone, or at least as much of it as I can. After that I'll be taping accordingly and then redoing the caulk with an ALEX type so that it's actually paintable. I'll be in the studio working all weekend. Hopefully I'll be able to make steady progress.