• TalkBass has been independent since 1998. Add your voice.
    Create a free account to reply to discussions, view embedded media, and browse with fewer display ads.
    Join freeLog in
    Want zero display ads or expanded classifieds tools? Compare plans.

My New Studio Build (perhaps overly detailed)

Bottom side of the ceiling trim has been de-caulked. That was a TON of work. I did a test of the upper side and it’s significantly easier since the vaulted ceiling creates a larger gap and the caulk can come out in clean pieces rather than all of the scraping and sanding that the bottom side required. The base trim will be another huge effort. I’ll be back at it tomorrow.
 
That's frustrating, silky. I think I mentioned something about using latex caulk a while back.....:whistle:

Was there not a way to apply the silicone caulk that wouldn't have required a layer of paint? Or was it going to be too obvious?
You did mention it, although the reasoning SHOULD have been moot since I specifically bought paintable silicone. All of the isolation benefits of silicone with none of the unpaintable drawbacks. What could go wrong?! :rollno:

It was definitely going to be noticeable. The ceiling with the vaulted geometry was especially noticeable.
 
  • Like
Reactions: DirtDog
Stating this for the record: After seeing how today went and how far behind I am at this point I cannot see a scenario wherein I finish this before the end of 2018. My decree a few months ago when “finish by the end of Fall” fell through was “finish by the end of Winter.” Since today is the winter solstice I still feel pretty good about that deadline.
 
My boss’ boss’ boss’ boss’ boss’ boss (aka the mayor) sent all of us home at 2:00 for the holiday. I capitalized on this by spending some time in the studio. The quarter round is now all de-caulked. I’m going to finish taping off the ceiling trim and painting the trim to wall transition.

I’m pretty sure I’ll do some work tomorrow too. If I can re-caulk the quarter round, tape the base and paint the wall to base trim transition I’ll be very happy.
 
  • Like
Reactions: Microbass
I was working this morning (6am-12pm). We’re now on our third bottle of champagne and we somehow bought a small chicken instead of a small turkey.

That is all.
Sounds about right!

I’m not doing champagne, but I am drinking my favorite holiday cocktail. It’s your basic egg nog, but with a couple of tweaks. One shot Kraken dark rum, one shot Kahlua, fresh ground nutmeg, ice, top with egg nog.

9E90FDC3-2BBE-48E3-A2B6-E8AA9F56BA7D.jpeg
 
Wall to base trim transition is painted. Just like the ceiling trim there’s a little bit of overrun that will need to be cleaned up. I’ll do that before I paint both sets of trim.

That’s the extent of the work I’m going to get done today. I’m working tomorrow, then traveling through Saturday. I’ll be back at it on Sunday though. My goal that day will be to get all the trim taped and painted. Once that’s done and everything is cleaned up I’ll be ready to start installing my acoustic treatments.