Half of the joist hangers have been removed. Once I got a system down they weren't too bad. More than 5, but less than 10 minutes each. I'll finish them off tomorrow.
TalkBass has been independent since 1998. Add your voice.
Create a free account to reply to discussions, view embedded media, and browse with fewer display ads.
Join free Log in
Want zero display ads or expanded classifieds tools? Compare plans.
People about my age (mid-30s) will surely remember back to the early 2000s when the rapper Nelly was quite a thing. He turned a bandaid on his face into a fashion statement. Today I attempted to do the same thing. Not wanting to be some lame poser I smashed myself in the face with the claw end of a framing hammer to legitimize the bandaid placement. In retrospect... Not the best of plans.
To add insult to injury, this was on THE FIRST nail of THE FIRST joist hanger I had started to remove!
View attachment 947057
Half of the hangers were on the south exterior wall, so for those it was never an option due to the fact that it's one of only four load bearing walls in the whole structure. On the non-load bearing partition wall I considered going that route, but since I'm going to build the top "triangle" that attaches to the scissor trusses and I've already got double top plates in-place, I need the triangle studs to align with the lower/main studs of the partition in order to keep it as strong as possible. The joist hangers align with those studs, so that was ruled out almost immediately. Had I envisioned going full height with this wall rather than lofting it, I wouldn't have installed the top plates at all and built continuously from floor to ceiling.If there were less joists, would you have considered cutting the wood and then ripping the hangers off?
You're still the envy of the entire readership here; for the skill, ability, sense of humor and perspective. I'd be kicking myself too, but there are a lot of people who are tipping their hat to you throughout this.I want to be the optimistic about the whole thing, haha. That said, when it involves me tearing down a perfectly good wall to remove 1-7/8" of height from the rough opening of a door it becomes a very hard pill to swallow.
I'll be able to repurpose the lumber elsewhere in the build, but it still stinks. Also, if I go full height with the wall I'll need to rent another truck as I'll need some 12' pieces of lumber to get the job done.
Stay positive... Stay positive...
I'm leaving for a vacation on Friday and won't be back until Monday the 26th. At this rate I won't get my final site and insulation inspections until 2017!
Good. Then I can expect this thread to continue and I don't have to spend cash on Netflix this year.

Arrrrgh! A season-finale cliff-hanger!I'm leaving for a vacation on Friday and won't be back until Monday the 26th. At this rate I won't get my final site and insulation inspections until 2017!
I hadn't thought of it like that, but you're totally right.Arrrrgh! A season-finale cliff-hanger!
and gets a haircut and a real job. Dude, you've changed.I hadn't thought of it like that, but you're totally right.
Here's a season 2 teaser. The narrative changes, I sell the house and leave the studio unfinished to live a life of beer drinking along the Oregon coast staring at the ocean.
View attachment 953717
