I can give a quick update on the August batch while I'm here. I'm in pretty good shape to finish well before the end of the month, and depending on how much else my wife has for me to do I should be able to get a solid chunk of the batch completely finished this weekend. A couple highlights:
- All enclosures have been finished. That's CNC milling, powdercoating, and UV printing. Completely done.
- 1 pedal has been completed, tested, and shipped (special circumstances)
- 10 pedals (all More) have been completed and are awaiting testing
- I expect to complete the remaining Mores today and get them all tested
When I have a to-do list, I tend to gravitate toward low-hanging fruit. If it's easier for me to do, I'm more likely to do it first. In monthly batches this means the SMD pedals will almost always get built before the handwired pedals, simply because they take a lot less time to build. All the boards have been completed for the Mores and I just need to get the last handful wired into the enclosures, then I'll move on to the remaining SMD pedals in the batch (DW, UA, JCE, LR, and Finally) before getting into the handwired builds.
The handwired builds range in complexity and parts count (Space Heater being the least parts and easiest build, Lab Rat being the most parts, Finally being the most complex to assemble), but for handwired builds I typically start with the circuit that has the most orders and go from there. This month HWDW and HWUA are tied at 4 orders each, so I'll start from there and move down the list until everything is done.
I have Friday off work for my day job so I was able to stay up Thursday night until 4AM working, if I have another night like that I'll be in pretty good shape to get all the SMD builds done Friday night, then get a good chunk of handwired builds done Saturday and Sunday. So I can't promise I'll finish everything this weekend, but I'm going to do as much as I can this weekend.