This is why I'm here!
I'm also interested to hear which meter gets the best recommendations
I'm also interested to hear which meter gets the best recommendations
TalkBass has been independent since 1998. Add your voice.
Create a free account to reply to discussions, view embedded media, and browse with fewer display ads.
Join free Log in
Want zero display ads or expanded classifieds tools? Compare plans.
Based on that and based on the map, then I would assume that it's safe to work wood to it's final shape when it's anywhere between 4-13% MC.You can never perfectly seal wood so eventually it will end up at EMC
Based on that and based on the map, then I would assume that it's safe to work wood to it's final shape when it's anywhere between 4-13% MC.
Booze and loose women?This is why I'm here!
I'm not sure what the ideal moisture content is. I'd guess that the ideal content varies slightly for different species.
While waiting for an answer, is that one of those pinless meters?
I need to get a meter and looking for input on accuracy and expected cost.
Yes, its pinless. I have no complaints, but I also havent compared it to a pin-style. I do like that it doesnt leave any marks.This is why I'm here!
I'm also interested to hear which meter gets the best recommendations
There are charts that will tell you what EMC is for a specific humidity and temperature. Then you can target a number based on knowing what conditions you're storing it in. Honestly, I don't look for a specific reading as much as I look for stability, i.e. the reading stops changing.
Awesome, thanks. This is info I cant seem to get reading articles online.Humidity in the 30s-40s will probably result in wood being in the 5-7% range before it's stable I'd bet. Air drying green wood from 12% down that far is probably at least months to a year depending on thickness.
I saw a setup like that online once. I dont really have the space for that. I'll keep it in mind though.I'm not sure how effective or what the timeframe would be, but the setup that pops into my head for smaller pieces of lumber would be to frame out a section of the garage or basement, plastic it off and run a basic portable dehumidifier with a drain hose hooked up so the bin doesn't have to be emptied. Just seal the end grain.
It would take longer than a kiln/oven, but that has to be quicker than just air drying.
So far there doesnt seem to be much splitting/cracking on the ash that's been down there for 13 months.
Humidity in the 30s-40s will probably result in wood being in the 5-7% range before it's stable I'd bet. Air drying green wood from 12% down that far is probably at least months to a year depending on thickness.
There are charts that will tell you what EMC is for a specific humidity and temperature. Then you can target a number based on knowing what conditions you're storing it in. Honestly, I don't look for a specific reading as much as I look for stability, i.e. the reading stops changing.
So my truss rod and pickups arrived, plus an additional truss rod that I guess was shipped in error.
my original plan was to install a central truss rod with CF bars either side, but I'm doing a 6 string and I've seen some with 2 truss rods…..
do I take this as a sign and switch to a single CF bar with a truss rod each side? Anyone done 2 truss rods before?
No. No one likes a show off.Do we get extra points if we build our own truss rods?
I secured an old, damaged oven for out in the garage specifically for baking out lumber. I guess its about time I run 220 out there and hook it up, get that number down towards 8%.
Then I can start drying these monsters out as well...
View attachment 4494196 View attachment 4494197
I'm okay with waiting until the start date to do any cutting whatsoever, but just wanna make sure I'm clear. And I probably already asked this twice, but,
- Dimensioned lumber includes: Billets, 1-pce neck blanks, matched tops, stringers, thin laminates, veneers, fingerboards, pre-slotted/radiused fretboards, etc.
- Scratch builds must not have any components glued up or cut out prior to the start.
Yes, you can get them down to the final dimensioned size needed for glue up, but just no gluing or cutting out shapes. So, for example, if your design calls for a 3/4" thick body core with 1/4" thick top and back plates, you can cut them to length, plane them to final thickness and have them completely ready for glue-up in time for the start. Just please don't glue them up until after the go on the 21st.I'm okay with waiting until the start date to do any cutting whatsoever, but just wanna make sure I'm clear. And I probably already asked this twice, but,
is it okay to resaw boards before the start date and get all the parts down to rough final thickness? (No shaping).
