• TalkBass has been independent since 1998. Add your voice.
    Create a free account to reply to discussions, view embedded media, and browse with fewer display ads.
    Join freeLog in
    Want zero display ads or expanded classifieds tools? Compare plans.

Worlds First Drum Machine in Pedal Form!

I mean the main footswitch looks to spring on a pivot at the back (rearward) edge ala Boss etc. Obviously a momentary foot button should not engage the main switch, and the obvious position is up near said pivot, away from accidental tapping and lacking torque on main switch due to proximity to pivot.

Yes, I think I understand you -- the momentary switches will be located along the center-line of the footswitch so it will be away from where you step on the main pedal to prevent accidental tapping.
 
Could be too.

What I mean is, replace "BEAT BUDDY" with momentary switches ready to go.

I know there are some Boss-like pedals with additional switches, but I would think that, in general, that requires internal space which the current version of the Beat Buddy may not have.
 
David, one more question. Maybe this is just wishful thinking, but is there any update on the delivery of these things? Still July? ANY chance it will be earlier?
 
David, one more question. Maybe this is just wishful thinking, but is there any update on the delivery of these things? Still July? ANY chance it will be earlier?

David,

I know that on a project like this, if things are going well, there is not much to report. Would it be possible for you to give us a bi weekly status update even if it is "No change in projected ETA and no reported issues from Manufacturing".

Thanks in advance.
Dimitrius
 
David,
I know that on a project like this, if things are going well, there is not much to report. Would it be possible for you to give us a bi weekly status update even if it is "No change in projected ETA and no reported issues from Manufacturing".

Thanks in advance.
Dimitrius
These things take months to years to get out. Don't make the poor guy slather on the b.s. on a timed basis. If my avatar can wait for it, so can you. :)
 
David,

I know that on a project like this, if things are going well, there is not much to report. Would it be possible for you to give us a bi weekly status update even if it is "No change in projected ETA and no reported issues from Manufacturing".

Thanks in advance.
Dimitrius

These things take months to years to get out. Don't make the poor guy slather on the b.s. on a timed basis. If my avatar can wait for it, so can you. :)

It's been about 4-6 weeks since the last update, which was the first time the timetable had slipped (for delivery since the crowdfunding campaign...obviously, the timetable had slipped repeatedly prior to getting the campaign started). I've been a huge supporter of this idea, I have participated extensively in this thread and on their Facebook page, and I was on the crowdfunding page literally the first minute that it opened, and ultimately one of the first 10 or so supporters. Having said all that, the 3-4 month pushback is a scary number to me, it's just a particular range that feels like it's putting the project in limbo. I have no experience with manufacturing and product development, I'm not going to pretend like I do. I realize, certainly, there are things which are out of David's control if they are relying on third-party parts.

But, at this point, what are the guarantees that this part will come through?

Is that part itself delayed until July, and if not, is there anyway the manufacturing can be expedited on Beat Buddy's end once they get the part?

I wasn't one of these people, so maybe it's none of my business, but what happens to the people who paid over twice as much ($399 IIRC) for the "Speedy Buddy" to get the "early delivery" (March instead of April)?

I'm not here with a pitchfork or anything, nor am I trying to "demand" answers. But I do have $179 (not to mention countless hopes and dreams!) tied up in this product. I think it's fair to ask for updates occasionally. David has mostly provided those in the past, and I hope he continues to do so.
 
It's been about 4-6 weeks since the last update, which was the first time the timetable had slipped (for delivery since the crowdfunding campaign...obviously, the timetable had slipped repeatedly prior to getting the campaign started).<snip>
But, at this point, what are the guarantees that this part will come through?

Is that part itself delayed until July, and if not, is there anyway the manufacturing can be expedited on Beat Buddy's end once they get the part?

I wasn't one of these people, so maybe it's none of my business, but what happens to the people who paid over twice as much ($399 IIRC) for the "Speedy Buddy" to get the "early delivery" (March instead of April)?

I'm not here with a pitchfork or anything, nor am I trying to "demand" answers. But I do have $179 (not to mention countless hopes and dreams!) tied up in this product. I think it's fair to ask for updates occasionally. David has mostly provided those in the past, and I hope he continues to do so.
I get all that bro... I do have experience with the manufacturing process of electronics - it is a long, slow process. If any of it is being made in Asia I'm thinking those parts probably haven't been actually started - 2500 parts is at the bottom end of the range of what they want to handle. It's all about quantity. Sorry I haven't read all 26 pages to get the details on how and where this is being made. I hope it isn't vapor-ware(vw)...I've seen a number of vw projects in my main gig of watches. Some of them were taking pre-sale orders for years, then fizzled out. I don't make this news, only reporting it. I pray it goes well for all concerned.
 
Oi!? You mean you're reworking the whole shebang to include momentary switches?

No. I think I misunderstood you. We're are not changing the BeatBuddy design. We are only working on the BeatBuddy branded footswitch, which will use momentary switches.
 
No. I think I misunderstood you. We're are not changing the BeatBuddy design. We are only working on the BeatBuddy branded footswitch, which will use momentary switches.

How will your branded foot switch be different from this one? I bought it after seeing it in your videos in preparation for the arrival of BB.

Johnson FX-020 Stereo Footswitch
http://www.amazon.com/gp/product/B000EO6N08/ref=oh_details_o03_s00_i00?ie=UTF8&psc=1

21HFH4TGAWL.jpg
 
As an Amazon Associate, TalkBass may receive commissions from qualifying purchases made via links on this site.
How will your branded foot switch be different from this one? I bought it after seeing it in your videos in preparation for the arrival of BB.

Johnson FX-020 Stereo Footswitch
http://www.amazon.com/gp/product/B000EO6N08/ref=oh_details_o03_s00_i00?ie=UTF8&psc=1

21HFH4TGAWL.jpg

I got one of those, too. Since I'm not using a pedalboard, I think the largish metal case will work well as a standalone switch. I replaced the switches with Carling momentary SPSTs and replaced the 20 foot cable with a Switchcraft 1/4" TRS jack.
 
As an Amazon Associate, TalkBass may receive commissions from qualifying purchases made via links on this site.

Latest posts