A couple more things once the tuners came in.
I think there was too much of a radius, so knock that down some:
Drilled for the tuners:
Fit the bridge "flush mounted".
Next things:
make a nut (oak)
Get the tail piece finished
Get the remaining body laminates done
File the saddles down to size and do a string mockup
Order the piezo cable
Get the buffer circuits made (An electronics engineer i know volunteered)
I think there was too much of a radius, so knock that down some:
Drilled for the tuners:
Fit the bridge "flush mounted".
Next things:
make a nut (oak)
Get the tail piece finished
Get the remaining body laminates done
File the saddles down to size and do a string mockup
Order the piezo cable
Get the buffer circuits made (An electronics engineer i know volunteered)
