- Feb 12, 2006
- 60,961
- 5
- 220,642
- Disclosures
- Development Engineer-Mesa Boogie, Development Engineer-Genzler (pedals), Product Support-Genz Benz
The LED's are wired in series, if one fails all 3 will go out.
Occassionally we see a bad blue LED. There is a significant difference in the construction of blue and white LEDs, which use either Sapphire or Silicon Carbide (depending on manufacturer) as the active substrate. Occassionally there will a failure. Incidently, white LEDs are blue LEDs with a phosphor coating that acts to translate emission bandwidth. This is the biggest single challenge facing the general prupose LED illumination industry, where there may be hundreds of LEDs in a single fixture and a single LED failure will be a problem as they are buily up with paralleled series strings fed with constant current sources.
Give Scott or Jeff a call at the factory and they will help you get this resolved under your warranty, no worries. If you are on the west coast, PM me and I'll take care of it at my R&D lab. It's not a DIY project however, there are high voltages inside the Streamliner and while it's a 5 minute job for us, it's not a user serviceable type project.
Occassionally we see a bad blue LED. There is a significant difference in the construction of blue and white LEDs, which use either Sapphire or Silicon Carbide (depending on manufacturer) as the active substrate. Occassionally there will a failure. Incidently, white LEDs are blue LEDs with a phosphor coating that acts to translate emission bandwidth. This is the biggest single challenge facing the general prupose LED illumination industry, where there may be hundreds of LEDs in a single fixture and a single LED failure will be a problem as they are buily up with paralleled series strings fed with constant current sources.
Give Scott or Jeff a call at the factory and they will help you get this resolved under your warranty, no worries. If you are on the west coast, PM me and I'll take care of it at my R&D lab. It's not a DIY project however, there are high voltages inside the Streamliner and while it's a 5 minute job for us, it's not a user serviceable type project.
