A rehearsal got cancelled, so I'm back to it tonight!
My electrician is so swamped with work that getting him out to the studio is proving to be a difficult task. The amount of construction happening around Seattle is staggering and this situation would not be made different by going with a different electrician, so I've made peace with it. That said, as a result of this delay my first task will be moving the drywall stockpile for the umpteenth time
I was hoping to leave the stockpile in place for the time being and knock out the north wall, but that can't be done until the electrical work is done at that end. It's all pretty simple, but I don't want to do it by myself and end up with some code violation. I need to punch a pair of 240V services through the north wall. One for the mini split system, and the other for a future hot tub we'll be placing out there. The outdoor condenser unit and the hot tub disconnect have to be a minimum clear distance from the hot tub (10' if memory serves), so the placement is critical. I placed the condenser as far from the proposed tub location as possible, so now all that's left is punching the services through, installing disconnects, etc. I'll need to also feed a single 120V service back into the studio space through both layers of drywall, which will provide power for the heat recovery ventilator. So alas, the north wall will have to wait for a bit.
The drywall stockpile is significantly smaller, so it won't be that big of a task, but still a heavy one. The lid is done, the eastern wall is done, and the eastern half of the southern wall is done. So with that in mind I can locate the remaining stockpile in the southeastern corner of the room and never have to move it again. I'll be very happy with that reality.
Once it's moved I can finish off the western half of the southern wall, set the clips and channel on the western wall, and finally finish out the western wall. If the electrical isn't done by that point I can fix some drywall mistakes I made in the vestibule. If the electrical still isn't done by that point I can still work on getting the sound door procured and installed. If the electrical still isn't done I can do busy work like cleaning the studio of construction debris, which is something I've done periodically and am rapidly approaching the point of needing to do it again, preemptively wrap the remaining electrical outlets on the north wall with acoustic putty pads, beef up the rubber isolation points on the outdoor condenser, and if the electrical still isn't done at that point I can move to exterior work and construct the hardscaping I have planned in front of the door. As you can see there's a lot of work that can be done while waiting for the electrical, but the ideal situation would obviously be for it to get done soon so I can wrap up the drywall completely before moving on to anything else.