****. I have this employee who was complaining about the speed of another of my guys to the supervisor of another shift. That supervisor extended that to my boss. He and I decided that the slow guy, who excels at packing, should only have to sheet(flatten out) his pizzas so he can start packing faster. To make this possible employee 1 has to mix the dough and shape it into rounds. Shaping would take guy 1 maybe 20 minutes and guy 2 an hour or more. Guy 1 is refusing to do the work claiming its to much. This same guy refused to finish work the other day because he was done packing his bread and no one helps him, so he shouldn't have to help the rest of the team. What he is failing to consider is that he never has to clean up our mixing area, or any machines other than the one he primarily uses. He never takes his trash out after production, only his packing trash, and 90% of the time if his bread has to be cases up, I do it for him.
Another thing he is failing to consider is that no one helps him pack because everyone else is still making bread while he packs. He and guy 2 are responsible for 2 products each and he has been vocal about only wishing to do the buns he is responsible for. Everyone else is responsible for 5-6 products, so generally we are producing for 6-9hours before we can help pack. It's a balance, more production is less packing, and less production is more packing.
The best part, I have to have another supervisor translate because my name is the extent of this guys anglais.
Sorry to rant, but **** this is frustrating. I get little to no sleep and this culero has me awake for hours before my shift texting me about how he refuses to do the assigned work. This is a grown ass man, 44 I believe. I'm 27 and will do whatever it takes to get the job done(and I don't expect that attitude in equal measure from everyone) but I really dislike having to shepard people almost 20 years older than me like children. It's ********. Pinche culero.