• TalkBass has been independent since 1998. Add your voice.
    Create a free account to reply to discussions, view embedded media, and browse with fewer display ads.
    Join freeLog in
    Want zero display ads or expanded classifieds tools? Compare plans.

The Sushi Box FX Secret Society

Hey everyone, another quick March batch update (because you guys seem to like that sort of thing ;) ):

After almost 2 weeks of 14-18 hours a day (but taking sundays off) my basement is almost done. Framing is 100% done and drywall is 95% done, and my parents are heading home today. My workshop is a mess as it became the default throw-everything-here space, but this afternoon/evening I will get it cleaned up and shift into high gear to get the March batch finished.

3/4 of the enclosures for the month are currently finished, and 1/3 of the circuit boards for the month (literally Westinghouse) are finished, so I have a sizeable dent in the work already, and I'm going to do everything I can short of working myself sick to get everything done by tomorrow and shipped April 1st.

Thank you all for your patience (even begrudging patience), I know waiting longer for gear isn't fun, but I really needed a better option for organizing my workspace and having a finished room instead of just a jumbled corner of an unfinished space is going to help a lot.
This seems like a time where "go slow to go fast" applies. take care of yourself
 
I certainly don't mind if my Slampegg X takes a bit longer. I rather have you stay in good health.

thanks Nathan! Sounds like the new shop area will be great once it’s all set up. I know everyone is anxious to get the pedals but I think everyone here empathetic and understanding. Don’t make yourself crazy. Another day or a few isn’t going to be the end of the world. Not for me anyway.

This seems like a time where "go slow to go fast" applies. take care of yourself
That's generally the same take my wife has on how I work on things. She won't stop me from staying up late to work on things, but when my eyes are swollen and it affects how I well I function she intervenes and forces me to sleep. Always nice to have someone that takes care of me better than I take care of myself :P

Also sounds like there’s a place for all y’all to stay when you visit Chicago. Well done.
I mean we're not going to rent it out or anything, but if anyone is passing through and needs a roof for a night, hit me up :cool:
 
Enough of this On Topic stuff...

@Sushi Box FX
How was the show?!?

Bonus points for gig pics/vids!

I'm jonesing so hard for live shows, it's not even a little bit funny!
It was pretty good, low-key, there was only about 30 people there including the other bands. No pics or videos that I'm aware of unfortunately. My wife and parents came, but so did my kids, so the adults were too busy wrangling kids to get a camera out :P
 
Hey everyone, another quick March batch update (because you guys seem to like that sort of thing ;) ):

After almost 2 weeks of 14-18 hours a day (but taking sundays off) my basement is almost done. Framing is 100% done and drywall is 95% done, and my parents are heading home today. My workshop is a mess as it became the default throw-everything-here space, but this afternoon/evening I will get it cleaned up and shift into high gear to get the March batch finished.

3/4 of the enclosures for the month are currently finished, and 1/3 of the circuit boards for the month (literally Westinghouse) are finished, so I have a sizeable dent in the work already, and I'm going to do everything I can short of working myself sick to get everything done by tomorrow and shipped April 1st.

Thank you all for your patience (even begrudging patience), I know waiting longer for gear isn't fun, but I really needed a better option for organizing my workspace and having a finished room instead of just a jumbled corner of an unfinished space is going to help a lot.
If it helps, I can wait. I'm out of town and won't be back until the 3rd, and deliveries will be a few days after that. Purple PA :)
 
Quick question for Nathan about the Black Eye X. Is the circuit soft clipping, hard clipping, both or neither? I’m reconsidering my high gain guitar needs and just want a better idea of how it would fit with what I have.
I’ll already have a PA on my board for cleans and an EQD Plumes for overdrive.
Black Eye is soft clipping, as are almost all of my pedals. Tubes by themselves without any solid-state device will always be soft clipped.

The only hard clipping pedal I have is Lab Rat, which technically gives both as it hard clips before the tube stage, but that pushes the tube stage into a soft clipped drive as well.
 
I like working late at night to get things done, but it's also pretty easy to talk me out of it when I'm tired. I was planning to stay up late last night in an effort to start catching up, but I never cleaned my solder stencils after last month, so I got a little done then cleaned my stencils and went to bed. Right now I'm at:

Powdercoating - 100%
UV Printing - 50%
Board Assembly - 50%
Final Assembly - 0%

I'll try to post regular updates to keep everyone in the loop, and I'll note the people that are open to pushing back shipping and hold off on those until later.
 
I'll try to post regular updates to keep everyone in the loop, and I'll note the people that are open to pushing back shipping and hold off on those until later.

Feel free to push my builds back as far as you need. No big rush, here. :thumbsup:
 
I like working late at night to get things done, but it's also pretty easy to talk me out of it when I'm tired. I was planning to stay up late last night in an effort to start catching up, but I never cleaned my solder stencils after last month, so I got a little done then cleaned my stencils and went to bed. Right now I'm at:

Powdercoating - 100%
UV Printing - 50%
Board Assembly - 50%
Final Assembly - 0%

I'll try to post regular updates to keep everyone in the loop, and I'll note the people that are open to pushing back shipping and hold off on those until later.

no rush for me