• TalkBass has been independent since 1998. Add your voice.
    Create a free account to reply to discussions, view embedded media, and browse with fewer display ads.
    Join freeLog in
    Want zero display ads or expanded classifieds tools? Compare plans.

Winter Build Off 2022 - Get Ready

So I think this has been answered, but I am going back and forth on a few things and want to make sure. I have a pre-pandemic build started that never got finished, a 4003. I am thinking I may pick that back up as an entry for a partial build since I have the center section glued up and a truss cavity cut, and my wing blanks are glued up. It has been sitting since the pandemic started and things got too crazy to finish it. Would that be acceptable as an entry?

I have an idea for something new, a 'rebirth' of an old idea that I think would be really cool, but I am also committed to building a pair of stingrays with one of my high school students this year, and am in the process of building a workshop. I just want to keep options open so I can be realistic about finishing all these projects within the timeline.
 
So I think this has been answered, but I am going back and forth on a few things and want to make sure. I have a pre-pandemic build started that never got finished, a 4003. I am thinking I may pick that back up as an entry for a partial build since I have the center section glued up and a truss cavity cut, and my wing blanks are glued up. It has been sitting since the pandemic started and things got too crazy to finish it. Would that be acceptable as an entry?

I have an idea for something new, a 'rebirth' of an old idea that I think would be really cool, but I am also committed to building a pair of stingrays with one of my high school students this year, and am in the process of building a workshop. I just want to keep options open so I can be realistic about finishing all these projects within the timeline.
Sounds like a good entry plan. :thumbsup: It will be helpful to provide pics at the start and an explanation of what you have and what you'll be doing with it, but overall sounds solid. :)
 
  • Like
Reactions: Verner
2970288e-1fcf-4425-ad29-6e846d0f79d1_text.gif
 
So, the large maple board I bought a while back and was saving for the next build is starting to twist up.
The board is roughly 8' long, 8" wide and a hair over 3/4" thick. I built an 8' x 12" shelf that's perfectly flat, for storing longer boards and the basement has been kept at 50% humidity since setting up shop.
So, I'm guessing this board was gonna do this no matter what. If it stops moving in the next month, should it be stable enough for neck lams after planing them flat?
I'm worried that if I go buy another piece, it will do the same thing.
 
  • Like
Reactions: Beej
So, the large maple board I bought a while back and was saving for the next build is starting to twist up.
The board is roughly 8' long, 8" wide and a hair over 3/4" thick. I built an 8' x 12" shelf that's perfectly flat, for storing longer boards and the basement has been kept at 50% humidity since setting up shop.
So, I'm guessing this board was gonna do this no matter what. If it stops moving in the next month, should it be stable enough for neck lams after planing them flat?
I'm worried that if I go buy another piece, it will do the same thing.
I liked this post, but I hate it when that happens to me. :(
 
  • Like
Reactions: AudioTaper
Are you grading (voting) on a curve? I can only work on stuff in 5 minute increments or at 3am. Anything more and the kids start fighting....
Yes! Kids seem to wait until just about the worst moment to start a battle. My workbench is currently indoors and it is hard to get any work done.

The idea of the outbuilding workshop I am making came out of this. If the list of life's greatest moments includes marriage and kids, a close third may be a space where you can lock the door, crank some tunes, and pretend the second one didn't happen for an hour or two. Don't get me wrong, I love my family, wouldn't change a thing, but they do tend to dominate your life. All three kids got sick this week, so I am running between makeup homework, covid testing, and keeping the peace between cranky inmates..
 
So, the large maple board I bought a while back and was saving for the next build is starting to twist up.
The board is roughly 8' long, 8" wide and a hair over 3/4" thick. I built an 8' x 12" shelf that's perfectly flat, for storing longer boards and the basement has been kept at 50% humidity since setting up shop.
So, I'm guessing this board was gonna do this no matter what. If it stops moving in the next month, should it be stable enough for neck lams after planing them flat?
I'm worried that if I go buy another piece, it will do the same thing.
If I find a board that is starting to move, i usually mitigate any twisting, warping or heaven forbid cracking by rough cutting it down to the intended sizes. Larger boards will warp and check more then small ones. I also wrap questionable boards to slow the drying .
 
Last edited:
If I find a board that is staruing to move, i usually mitigate any twisting, warping or heaven forbid cracking by rough cutting it down to the intended sizes. Larger boards will warp and check more then small ones. I also wrap questionable boards to slow the drying .

Good advice. I would also add that if the shelf you're storing it on is solid then you should have it raised up on some thin battens so the air can get to both sides.