• TalkBass has been independent since 1998. Add your voice.
    Create a free account to reply to discussions, view embedded media, and browse with fewer display ads.
    Join freeLog in
    Want zero display ads or expanded classifieds tools? Compare plans.

Winter Build-Off 2023: Twin Tigers!!!

Wow… glad you’re ok. You figure if something is going to happen it will be a power tool, not the cord.
It’s always the thing you don’t expect that gets you. When I was a kid I spend an hour fooling around on my cousin’s skateboard on the broken concrete and didn’t get a scratch. Then went into the garage to put it away, tripped over the lawnmower, and face planted hard enough to earn a dozen stitches.
 
Shop reorg has come along nicely and I’m getting ready to resume work. All of my major sawdust-producing tools are now on wheels and can be rolled outside when in use. Only downside is that I’ll be weather dependent and we have rain coming all week long - but the plus side is a largely dust-free space. For a guy with allergies, it’s a win.

DC24A611-76BE-44C0-BE01-96CC83237C6E.jpeg
 
The clean workshop looks great!

Thanks Lisa. I need to continually remind myself how much my productivity and efficiency improve when I take the time to put things away as soon as I'm finished with them, preventing piles from stacking up on the workbenches, etc. The extra five minutes of cleanup might save a half hour of actual build progress. And with such limitations on my free time, every minute matters!
 

Latest posts