And I thought November was a long time away.Only if the build was completed in six months from time of order![]()
TalkBass has been independent since 1998. Add your voice.
Create a free account to reply to discussions, view embedded media, and browse with fewer display ads.
Join free Log in
Want zero display ads or expanded classifieds tools? Compare plans.
And I thought November was a long time away.Only if the build was completed in six months from time of order![]()
Don’t tell me about it. Mine is supposed to arrive in September. Can’t waaaaaaitIt feels like the last 6 months are the longest.

I'll comment and say OH MAN that red one! Red pearloid inlays on a dark fretboard and fiesta red body is the custom job I've been dreaming of. I'm not even sure why, never been a person for red before, but the red blocks do it for me now.![]()
I used to have one just like it! It was a great bass, but I wasn't a fan of how the bass hung on a strap compared to my D-Bird. It hung very flat, where the D-Bird hangs much more upright. The D-Bird ergonomics and sound are simply perfect for my playstyle in my death metal band, so I let the AB1 go and got a 2nd BirdDid anyone here get that natural 4 string Afterburner on Reverb? Looked like a good deal!
Since we’re in the same build queue I suspect I’m also about 12 months out. My build will be simpler than yours, so MAYBE it goes through a little faster, but somehow I doubt it.If timelines haven't slipped (I'd be surprised if they haven't), I'm ~12 months away from my Z.
I'm honestly not sure on how that goes. If it's first in, first out, we should be picking ours up like the same day. If they build in batches or anything like that, I could easily see yours getting done before mine. Can't wait to see yours, as well though!Since we’re in the same build queue I suspect I’m also about 12 months out. My build will be simpler than yours, so MAYBE it goes through a little faster, but somehow I doubt it.
I have to imagine they batch process things. Cutting bodies and necks are surely done by different staff than paint or electronics installation. I could be wrong though. Regardless I suspect we’ll both be waiting a while, which is fine since it’s not like anyone here in Seattle is gigging anyway.I'm honestly not sure on how that goes. If it's first in, first out, we should be picking ours up like the same day. If they build in batches or anything like that, I could easily see yours getting done before mine. Can't wait to see yours, as well though!
I'm glad I could help to shore up the 4-string numbersand way less 4's...

Undeservedly?!?Undeservedly, the 6s are fantastic.
I just didn't know I needed one until I got oneNow I even enjoy it more than 5ers, and I don't even use the 6th string that much (hmm although ..).
Originally I bought it to have a F# bass but it's just so good I never got to convert it.
Now I'm pondering getting a second 6 for that ..
Undeservedly?!?
they sell more 5's, slightly less 6's, and way less 4's...
I'm glad I could help to shore up the 4-string numbers![]()
You got that purple AB right?Undeservedly, the 6s are fantastic.
I just didn't know I needed one until I got oneNow I even enjoy it more than 5ers, and I don't even use the 6th string that much (hmm although ..).
Originally I bought it to have a F# bass but it's just so good I never got to convert it.
Now I'm pondering getting a second 6 for that ..